BERIKUT DAFTAR PEMBIMBING TUGAS AKHIR 2016 FTSP JAYABAYA
JADWAL PEMBIMBING TUGAS AKHIR | |||||
PROGRAM STUDI TEKNIK SIPIL LANJUTAN ANGKATAN 40 | |||||
FTSP UNIVERSITAS JAYABAYA SEMESTER GANJIL 2015/2016 | |||||
No | NAMA | NO. POKOK | JUDUL TUGAS AKHIR | DOSEN PEMBIMBING | Ket |
1 | CHAIRUNNISA | 2014731150095 | PERENCANAAN DINDING TANAH (SOLDIER PILE) PADA PROYEK CLEVELAND SETIA BUDI BANDUNG JAWA BARANG | IR. DARMADI, MM | OKE |
2 | EDI WIBOWO | 2014731150104 | ANALISA DAYA DUKUNG PONDASI BORED PILE PADA PROYEK PEMBANGUNAN HOTEL CLEVELAND SETIABUDI BANDUNG JAWA BARAT | IR. DARMADI, MM | OKE |
3 | HANNA SINAGA | 2014731150113 | REDESAIN STRUKTUR BALOK DAN KOLOM PADA PROYEK HOTEL SAHID CLEVELAND SETIA BUDI BANDUNG | IR. DARMADI, MM | OKE |
4 | ANGGA YANI RAHMAN | 2014731150089 | KORDINASI SIMPANG 4 TOL BEKASI TIMUR , SIMPANGAN 4RS MITRA KELUARGA DAN SIMPANGA 4 UNISMA | IR. DARMADI, MM. | OKE |
5 | DIAN SETIAWAN | 2014731150101 | PERENCANAAN DRAINASE KAWASAN SIMPANG JOHAR, ABDULLAH BIN NUH, SHOLEH ISKANDAR KOTA BOGOR | IR. DARMADI, MM. | OKE |
6 | IJAN SOPIAN | 2014731150121 | ANALISA KONTRUKSI BREAKWATER PROYEK PEMBANGUNAN TERMINAL PETI KEMAS PENGEMBANGAN PELABUHAN TANJUNG PRIOK DI UTARA KALI BARU | IR. DARMADI, MM. | OKE |
7 | NOPOLION EKA PUTRA | 2014731150135 | PERENCANAAN PERKERASAN LENTUR DENGAN MENGGUNAKAN METODE BINAMARGA NO: 02/M/BM/2013 PADA PROYEK JL.H.DJOLE BANTAR GERBANG BEKASI | IR. DARMADI, MM. | OKE |
8 | YOGA CORNIA PRADANI | 2014731150151 | KAJIAN RELOKASI TERMINAL ANGKUTAN BARANG PADA JARINGAN LINTAS ANGKUTA BARANG DIKABUPATEN PATI | IR. DARMADI, MM. | OKE |
9 | AHMAD YUSRAN | 2014731150085 | ANALISIS PENGENDALIAN PROYEK KONSTRUKSI MENGACU PADA PELAKSANAAN PENJADWALAN WAKTU DENGAN METODE KONVENSIONAL DAN LINIER | IR. ERI SETIA ROMADHON, MT. | OKE |
10 | AIDI RAHMAN | 2014731150086 | ANALISIS PERCEPATAN PROYEK DENGAN METODE LEAST COST SCHEDULING | IR. ERI SETIA ROMADHON, MT. | OKE |
11 | HANNA SRI AGUSTINA EMINIM SIHOMBING | 2014731150114 | ANALISIS KEBUTUHAN DERMAGA PELABUHAN PENYEBERANGAN TANJUNG KALIAN KABUPATEN BANGKA BARAT | IR. ERI SETIA ROMADHON, MT. | OKE |
12 | HOLTER GYVER PARNINGOTAN | 2014731150119 | ANALISIS PENGENDALIAN BIAYA DAN WAKTU PROYEK PEMBANGUNAN APARTEMEN SAUMATA | IR. ERI SETIA ROMADHON, MT. | OKE |
13 | JATMIKO SURYA AJI | 2014731150124 | PERENCANAAN STRUKTUR GEDUNG AUDITORIUM POLITEKNIK NEGERI BATAM BATAM KEPULAUAN RIAU | IR. ERI SETIA ROMADHON, MT. | OKE |
14 | MAULANA RIZZAK FUADHI | 2014731150129 | PERENCANAAN ULANG STRUKTUR MASJID POLITEKNIK NEGERI BATAM BATAM KEPULAUAN RIAU | IR. ERI SETIA ROMADHON, MT. | OKE |
15 | ROHMATULLOH AKBAR | 2014731150144 | REDESAIN STRUKTUR KOLOM DAN BALOK BETON BERTULANG PADA PROYEK GEDUNG LABORATORIUM NASIONAL BALITBANGKES JAKARTA | IR. ERI SETIA ROMADHON, MT. | OKE |
16 | SITI NOVA NURLAIFAH | 2014731150147 | MANAJEMEN DAN REKAYASA LALU LINTAS SIMPANG MANGKALAYA DAN SIMPANG CIPANAS DI KABUPATEN SUKABUMI | IR. ERI SETIA ROMADHON, MT. | OKE |
17 | SYAIFUL ANWAR | 2014731150149 | ANALISIS PERKUATAN STRUKTUR DENGAN FIBER REINFORCED POLYMER (FRP) PADA PROYEK GEDUNG AHU KEMENTRIAN HUKUM DAN HAM | IR. ERI SETIA ROMADHON, MT. | OKE |
18 | ARYANI | 2014731150092 | ANALISA PEMINDAHAN KAPAL CEPAT DI PELABUHAN BOOM BARU KOTA PALEMBANG KE PELABUHAN TANJUNG API-API KABUPATEN BANYUASIN | IR. H. INDARTONO RIVAI, MM. | OKE |
19 | BARLIAN RADITYA ALKA | 2014731150094 | PERENCANAAN ANGGARAN BIAYA DENGAN MEMAKAI APLIKASI ESTIMATOR 2.0 | IR. H. INDARTONO RIVAI, MM. | OKE |
20 | FARDHI PRATAMA | 2014731150109 | PERENCANAAN STRUKTUR ATAS GEDUNG SDN KLENDER 15 PAGI DKI JAKARTA | IR. H. INDARTONO RIVAI, MM. | OKE |
21 | FEBRI ARDIANSA | 2014731150110 | ANALISA KEBUTUHAN PARKING APRON PIER 1 TERMINAL 3 ULTIMATE BANDARA SOEKARNO HATTA | IR. H. INDARTONO RIVAI, MM. | OKE |
22 | HENGKY DWIYATMOKO | 2014731150116 | ANALISA JENIS PONDASI TIANG PANCANG PADA PROYEK APARTEMEN ELPIS RESIDANCE JAKARTA PUSAT | IR. H. INDARTONO RIVAI, MM. | OKE |
23 | HERLYANA ENDAH PRATIWI | 2014731150118 | ANALISA PENINGKATAN KAPASITAS PELABUHAN PENYEBRANGAN KARIANGAU DI KOTA BALIKPAPAN PROPINSI KALIMANTAN TIMUR | IR. H. INDARTONO RIVAI, MM. | OKE |
24 | IRHAM HAFID | 2014731150122 | ANALISA PERKUATAN LERENG MENGGUNAKAN SHEET PILE PADA PROYEK PEMBANGUNAN RESORT VIMALA HILLS BOGOR | IR. H. INDARTONO RIVAI, MM. | OKE |
25 | NOVITA IKE TRIYULIANI | 2014731150136 | REDESAIN STRUKTUR GEDUNG 4 LANTAI RSIA AMINAH KOTA BLITAR | IR. H. INDARTONO RIVAI, MM. | OKE |
26 | DYAH ANGGRAENI UTAMI | 2014731150102 | ANALISA POTENSI TRANSPORTASI SUNGAI DAN DANAU DI PROPINSI SUMATRA BARAT | IR. HJ. FATMAWATI OEMAR, MM. | OKE |
27 | EKO BAYU AJI | 2014731150105 | OPTIMALISASI TOWER T/L 150 KV EE4+15 TERHADAP LEBAR KAKI MENGGUNAKAN SOFTWERE MS TOWER | IR. HJ. FATMAWATI OEMAR, MM. | OKE |
28 | GUNTUR ANDI WIBOWO | 2014731150111 | ANALISA KINERJA ANGKUTAN DAN PELABUHAN DI PELABUHAN PENYEBRANGAN MERAK PROVINSI BANTEN | IR. HJ. FATMAWATI OEMAR, MM. | OKE |
29 | HAFIZ HADIWIRYA | 2014731150112 | STUDI PERBANDINGAN EFESIENSI DAN EKONOMI PERKUATAN STRUKTUR LANTAI BASEMENT MENGGUNAKAN METODE FRP DAN KONVENSIONAL PROYEK G3TV JAKARTA | IR. HJ. FATMAWATI OEMAR, MM. | OKE |
30 | HERI PRIATNO SAPUTRO | 2014731150117 | PERENCANAAN PEMBANGUNAN RACK SYSTEM DI WILAYAH KAWASAN PT. INDONESIA KENDARAAN TERMINAL TANJUNG PRIOK | IR. HJ. FATMAWATI OEMAR, MM. | OKE |
31 | MICKE PUTRI PRIMA SARI | 2014731150131 | AUDIT KESELAMATAN DAERAH RAWAN KECELAKAAN PADA RUAS JALAN RAYA BOGOR KM. 33 KOTA | IR. HJ. FATMAWATI OEMAR, MM. | OKE |
32 | PUTRI VIRGIYANTI | 2014731150139 | ANALISA PENINGKATAN ANGKUTAN SEMEN DI DAERAH OPERASI 5 PURWOKERTO | IR. HJ. FATMAWATI OEMAR, MM. | OKE |
33 | SEPTIAN RACHMAN | 2014731150146 | EVALUASI OPTIMALISASI KINERJA PELAYANAN ANGKUTAN TAKSI DI WILAYAH KABUPATEN BANYUMAS | IR. HJ. FATMAWATI OEMAR, MM. | OKE |
34 | ZANI NURLESMANA | 2014731150153 | ANALISA KAPASITAS LINTAS BANDUNG – CICALENGKA | IR. HJ. FATMAWATI OEMAR, MM. | OKE |
35 | MOHAMMAD AZHARUDIN | 2014731150134 | MANAJEMEN DAN REKAYASA LALU LINTAS PADA PEMBANGUNAN PABRIK PAKAN TERNAK DIDAEARH SURADADI KECAMATAN GRINGSING KABUPATEN BATANG-JAWA TENGAH | IR. SRI YUARTI, MT. | OKE |
36 | ELIN MUFLIHATIN | 2014731150106 | MANAJEMN DAN REKAYASA LALU LINTAS RENCANA PUSAT PEMERINTAH KABUPATEN SERANG (PUSPEMKAB) | IR. SRI YUNARTI, MT. | OKE |
37 | ADE FERY DARMADI | 2014731150081 | PERENCANAAN LAJUR KHUSUS SEPEDA PENGHUBUNG TAMAN PANCASILA DAN TAMAN BENDOSARI | IR. SRI YUNIARTI, MT. | OKE |
38 | AGMITA LESTARI AMBARITA | 2014731150083 | KAITAN KARAKTERRISTIK KELUARGA TERHADAP PEMILIHAN MODA UNTUK BEKERJA DIKOTA BEKASI | IR. SRI YUNIARTI, MT. | OKE |
39 | DANI DAHNIAR | 2014731150096 | ANALISIS PERENCANAAN PEMBANGUNAN FASILITAS PERJALAN KAKI GAJAL MADA KOTA MOJOKERTO | IR. SRI YUNIARTI, MT. | OKE |
40 | DEVITA NURJAYANTI | 2014731150097 | PERENCANAAN PENGOPERASIAN BUS SEKOLAH PADA KAWASAN PENDIDIKAN DI CBR KABUPATEN CILACAP | IR. SRI YUNIARTI, MT. | OKE |
41 | ARIEF RACHMAN HAKIM | 2014731150090 | KINERJA JALAN DAN PENANGANAN KEMACETAN JALAN TOLE ISKANDAR DIKOTA DEPOK | IR. SRI YUNIARTI, MT. | OKE |
42 | DIAN PUTRA RUAMARGA | 2014731150100 | PENINGKATAN KINERJA SIMPANGAN PADA RUAS JALAN KH ABDUL HALIM DI KABUPATEN MAJALENGKA | IR. SRI YUNIARTI, MT. | OKE |
43 | ADI IMRON ROSADI | 2014731150082 | PENGARUH BANGKITAN DAN TARIKAN PERJALANAN BARU TERHADAP KINERJA LALU LINTAS (STUDI KASUS PEMBANGUNAN MALL METRO STATER DEPOK) | IR. SRIYUNIARTI, MT. | OKE |
44 | RONGGO WARSITO | 2014731150145 | ANALISA KEBUTUHAN ANGKUTAN KOMPUTER KORIDOR CIBUBUR-LEBAK BULUS | IR. SUDARWATI, MM. | OKE |
45 | DEWI AMALIA BUDIMAN | 2014731150098 | PENINGKATAN FASILITAS PELAYANAN STASIUN CAKUNG | IR. SUDARWATI, MM. | OKE |
46 | LAKSMI INDAH PUSPITA | 2014731150125 | ANALISIS KAPASITAS LINTAS JALUR KERETA API MAJA- RANGKAS BITUNG | IR. SUDARWATI, MM. | OKE |
47 | MARETA GATY WIDYASTUTI | 2014731150128 | ANALISIS KINERJA OPERASI KERETA API PRAMBANAN EKSPRES RELASI KUTOARJO – YOGYAKARTA – SOLO BALAPAN | IR. SUDARWATI, MM. | OKE |
48 | WENING LARASATI | 2014731150150 | OPTIMALISASI PERAWATAN JALAN REL DILINTAS PRUPUK-TEGAL | IR. SUDARWATI, MM. | OKE |
49 | AHMAD RIZAL KURNIAWAN | 2014731150084 | ANALISIS PARK&RIDE UNTUK MENDUKUNG KRL LINTAS NABGGARAI-BOGOR | IR. SUDARWATI, MT. | OKE |
50 | MEDIKO LUMBAN GAOL | 2014731150130 | PENINGKATAN JUMLAH ANGKUTAN KERETA API LINTAS SUKABUMI – BOGOR | IR. SUDARWATI, MT. | OKE |
51 | NUR AYUNINGSIH | 2014731150137 | ANALISA DAYA DUKUNG PONDASI BORE PILE PADA PROYEK TOWE3R 2 DAN 3 APARTEMEN SYNTHERIS RESIRENCE KEMANG | IR. SUDARWATI, MT. | OKE |
52 | ANDIKA BAGAS RIYADI | 2014731150087 | BELUM PROPOSAL | ||
53 | ANGGA DYAN RIZTYANTO | 2014731150088 | BELUM PROPOSAL | ||
54 | AYU FITRI WIJAYANTI | 2014731150093 | BELUM PROPOSAL | ||
55 | ARIESNA PUTRA CAHYA | 2014731150091 | MANAJEMEN DAN REKAYASA LALU LINTAS (MRLL) SEKITAR SIMPANG TUGU ADIPURA DI KOTA BANJARBARU | IR. DARMADI, MM. | OKE |
56 | DHITA AYU DAMAYANTI | 2014731150099 | BELUM PROPOSAL | ||
57 | ENDAH AYU PRATIWI | 2014731150103 | BELUM PROPOSAL | ||
58 | ESTHER PUTRI NATALLIE | 2014731150107 | BELUM PROPOSAL | ||
59 | EVANDER WYK | 2014731150108 | BELUM PROPOSAL | ||
60 | HAPPY COLA MITRA SURYA | 2014731150115 | BELUM PROPOSAL | ||
61 | IKHSAN TRI YANUAR | 2014731150120 | BELUM PROPOSAL | ||
62 | JATI KRISTIANTO | 2014731150123 | PROPOSAL BELUM DISETUJUI | ||
63 | LEONARD THONI B. MANURUNG | 2014731150126 | EVALUASI PERENCANAAN WAKTU DAN BIAYA PROYEK PEMBANGUNAN APARTEMEN CALLIA PADA PT. NUSA RAYA CIPTA | IR. ERI SETIA ROMADHON, MT. | OKE |
64 | MUHAMMAD AGUS EKO | 2014731150127 | ANALISIS ARUS BALIK AIR PADA SALURAN DARINASE PRIMER NGESTIHARJO DAN KARANGWUNI KABUPATEN KULONPROGO | IR. DARMADI, MM. | OKE |
65 | MIZAN DIMAS RADITYO | 2014731150132 | PROPOSAL BELUM DISETUJUI | ||
66 | MOCHAMAD FAISAL SUHENDI | 2014731150133 | PROPOSAL BELUM DISETUJUI | ||
67 | PRIYANTO SUPRAYOGI | 2014731150138 | PROPOSAL BELUM DISETUJUI | ||
68 | REDI ASTANTO | 2014731150140 | BELUM PROPOSAL | ||
69 | RISWAN OKI FERNANDO SIDABUTAR | 2014731150141 | EVALUASI PERHITUNGAN RENCANA ANGGARAN BIAYA (RAB) PROYEK PEMBANGUNAN APARTEMEN CALLIA PULOMAS | IR. H. INDARTONO RIVAI, MM. | OKE |
70 | ROCHMAN KURNIAWAN | 2014731150142 | BELUM PROPOSAL | ||
71 | ROHMA AGUSTINA | 2014731150143 | BELUM PROPOSAL | ||
72 | SUCIANA NURLIMARTA | 2014731150148 | BELUM PROPOSAL | ||
73 | YUDHA DESTAMAN | 2014731150152 | BELUM PROPOSAL | ||
Catatan : | |||||
1. Syarat Tugas Akhir Nilai harus lengkap dan minimal D | JAKARTA, 12 MARET 2016 | ||||
2. Lunas Pembayaran Uang Kuliah sampai bulan Maret 2016 | KETUA PROGRAM PLTS | ||||
3. Pelaksanaan Seminar & Sidang Juli 2016 | |||||
IR. ERI SETIA ROMADHON, MT. |
Advertisements