DAFTAR PEMBIMBING TUGAS AKHIR 2016


BERIKUT DAFTAR PEMBIMBING TUGAS AKHIR 2016 FTSP JAYABAYA

JADWAL   PEMBIMBING TUGAS AKHIR
PROGRAM STUDI TEKNIK SIPIL LANJUTAN   ANGKATAN 40
FTSP UNIVERSITAS JAYABAYA SEMESTER GANJIL 2015/2016
 
No NAMA NO. POKOK JUDUL TUGAS AKHIR DOSEN PEMBIMBING Ket
1 CHAIRUNNISA 2014731150095 PERENCANAAN DINDING TANAH (SOLDIER PILE) PADA PROYEK CLEVELAND SETIA BUDI BANDUNG JAWA BARANG IR. DARMADI, MM OKE
2 EDI WIBOWO 2014731150104 ANALISA DAYA DUKUNG PONDASI BORED PILE PADA PROYEK PEMBANGUNAN HOTEL CLEVELAND SETIABUDI BANDUNG JAWA BARAT IR. DARMADI, MM OKE
3 HANNA SINAGA 2014731150113 REDESAIN STRUKTUR BALOK DAN KOLOM PADA PROYEK HOTEL SAHID CLEVELAND SETIA BUDI BANDUNG IR. DARMADI, MM OKE
4 ANGGA YANI RAHMAN 2014731150089 KORDINASI SIMPANG 4 TOL BEKASI TIMUR , SIMPANGAN 4RS MITRA KELUARGA DAN SIMPANGA 4 UNISMA IR. DARMADI, MM. OKE
5 DIAN SETIAWAN 2014731150101 PERENCANAAN DRAINASE KAWASAN SIMPANG JOHAR, ABDULLAH BIN NUH, SHOLEH ISKANDAR KOTA BOGOR IR. DARMADI, MM. OKE
6 IJAN SOPIAN 2014731150121 ANALISA KONTRUKSI BREAKWATER PROYEK PEMBANGUNAN TERMINAL PETI KEMAS PENGEMBANGAN PELABUHAN TANJUNG PRIOK DI UTARA KALI BARU IR. DARMADI, MM. OKE
7 NOPOLION EKA PUTRA 2014731150135 PERENCANAAN PERKERASAN LENTUR DENGAN MENGGUNAKAN METODE BINAMARGA NO: 02/M/BM/2013 PADA PROYEK JL.H.DJOLE BANTAR GERBANG BEKASI IR. DARMADI, MM. OKE
8 YOGA CORNIA PRADANI 2014731150151 KAJIAN RELOKASI TERMINAL ANGKUTAN BARANG PADA JARINGAN LINTAS ANGKUTA BARANG DIKABUPATEN PATI IR. DARMADI, MM. OKE
9 AHMAD YUSRAN 2014731150085 ANALISIS PENGENDALIAN PROYEK KONSTRUKSI MENGACU PADA PELAKSANAAN PENJADWALAN WAKTU DENGAN METODE KONVENSIONAL DAN LINIER IR. ERI SETIA ROMADHON, MT. OKE
10 AIDI RAHMAN 2014731150086 ANALISIS PERCEPATAN PROYEK DENGAN METODE LEAST COST SCHEDULING IR. ERI SETIA ROMADHON, MT. OKE
11 HANNA SRI AGUSTINA EMINIM SIHOMBING 2014731150114 ANALISIS KEBUTUHAN DERMAGA PELABUHAN PENYEBERANGAN TANJUNG KALIAN KABUPATEN BANGKA BARAT IR. ERI SETIA ROMADHON, MT. OKE
12 HOLTER GYVER PARNINGOTAN 2014731150119 ANALISIS PENGENDALIAN BIAYA DAN WAKTU PROYEK PEMBANGUNAN APARTEMEN SAUMATA IR. ERI SETIA ROMADHON, MT. OKE
13 JATMIKO SURYA AJI 2014731150124 PERENCANAAN STRUKTUR GEDUNG AUDITORIUM POLITEKNIK NEGERI BATAM BATAM KEPULAUAN RIAU IR. ERI SETIA ROMADHON, MT. OKE
14 MAULANA RIZZAK FUADHI 2014731150129 PERENCANAAN ULANG STRUKTUR MASJID POLITEKNIK NEGERI BATAM BATAM KEPULAUAN RIAU IR. ERI SETIA ROMADHON, MT. OKE
15 ROHMATULLOH AKBAR 2014731150144 REDESAIN STRUKTUR KOLOM DAN BALOK BETON BERTULANG PADA PROYEK GEDUNG LABORATORIUM NASIONAL BALITBANGKES JAKARTA IR. ERI SETIA ROMADHON, MT. OKE
16 SITI NOVA NURLAIFAH 2014731150147 MANAJEMEN DAN REKAYASA LALU LINTAS SIMPANG MANGKALAYA DAN SIMPANG CIPANAS DI KABUPATEN SUKABUMI IR. ERI SETIA ROMADHON, MT. OKE
17 SYAIFUL ANWAR 2014731150149 ANALISIS PERKUATAN STRUKTUR DENGAN FIBER REINFORCED POLYMER (FRP) PADA PROYEK GEDUNG AHU KEMENTRIAN HUKUM DAN HAM IR. ERI SETIA ROMADHON, MT. OKE
18 ARYANI 2014731150092 ANALISA PEMINDAHAN KAPAL CEPAT DI PELABUHAN BOOM BARU KOTA PALEMBANG KE PELABUHAN TANJUNG API-API KABUPATEN BANYUASIN IR. H. INDARTONO RIVAI, MM. OKE
19 BARLIAN RADITYA ALKA 2014731150094 PERENCANAAN ANGGARAN BIAYA DENGAN MEMAKAI APLIKASI ESTIMATOR 2.0 IR. H. INDARTONO RIVAI, MM. OKE
20 FARDHI PRATAMA 2014731150109 PERENCANAAN STRUKTUR ATAS GEDUNG SDN KLENDER 15 PAGI DKI JAKARTA IR. H. INDARTONO RIVAI, MM. OKE
21 FEBRI ARDIANSA 2014731150110 ANALISA KEBUTUHAN PARKING APRON PIER 1 TERMINAL 3 ULTIMATE BANDARA SOEKARNO HATTA IR. H. INDARTONO RIVAI, MM. OKE
22 HENGKY DWIYATMOKO 2014731150116 ANALISA JENIS PONDASI TIANG PANCANG PADA PROYEK APARTEMEN ELPIS RESIDANCE JAKARTA PUSAT IR. H. INDARTONO RIVAI, MM. OKE
23 HERLYANA ENDAH PRATIWI 2014731150118 ANALISA PENINGKATAN KAPASITAS PELABUHAN PENYEBRANGAN KARIANGAU DI KOTA BALIKPAPAN PROPINSI KALIMANTAN TIMUR IR. H. INDARTONO RIVAI, MM. OKE
24 IRHAM HAFID 2014731150122 ANALISA PERKUATAN LERENG MENGGUNAKAN SHEET PILE PADA PROYEK PEMBANGUNAN RESORT VIMALA HILLS BOGOR IR. H. INDARTONO RIVAI, MM. OKE
25 NOVITA IKE TRIYULIANI 2014731150136 REDESAIN STRUKTUR GEDUNG 4 LANTAI RSIA AMINAH KOTA BLITAR IR. H. INDARTONO RIVAI, MM. OKE
26 DYAH ANGGRAENI UTAMI 2014731150102 ANALISA POTENSI TRANSPORTASI SUNGAI DAN DANAU DI PROPINSI SUMATRA BARAT IR. HJ. FATMAWATI OEMAR, MM. OKE
27 EKO BAYU AJI 2014731150105 OPTIMALISASI TOWER T/L 150 KV EE4+15 TERHADAP LEBAR KAKI MENGGUNAKAN SOFTWERE MS TOWER IR. HJ. FATMAWATI OEMAR, MM. OKE
28 GUNTUR ANDI WIBOWO 2014731150111 ANALISA KINERJA ANGKUTAN DAN PELABUHAN DI PELABUHAN PENYEBRANGAN MERAK PROVINSI BANTEN IR. HJ. FATMAWATI OEMAR, MM. OKE
29 HAFIZ HADIWIRYA 2014731150112 STUDI PERBANDINGAN EFESIENSI DAN EKONOMI PERKUATAN STRUKTUR LANTAI BASEMENT MENGGUNAKAN METODE FRP DAN KONVENSIONAL PROYEK G3TV JAKARTA IR. HJ. FATMAWATI OEMAR, MM. OKE
30 HERI PRIATNO SAPUTRO 2014731150117 PERENCANAAN PEMBANGUNAN RACK SYSTEM DI WILAYAH KAWASAN PT. INDONESIA KENDARAAN TERMINAL TANJUNG PRIOK IR. HJ. FATMAWATI OEMAR, MM. OKE
31 MICKE PUTRI PRIMA SARI 2014731150131 AUDIT KESELAMATAN DAERAH RAWAN KECELAKAAN PADA RUAS JALAN RAYA BOGOR KM. 33 KOTA IR. HJ. FATMAWATI OEMAR, MM. OKE
32 PUTRI VIRGIYANTI 2014731150139 ANALISA PENINGKATAN ANGKUTAN SEMEN DI DAERAH OPERASI 5 PURWOKERTO IR. HJ. FATMAWATI OEMAR, MM. OKE
33 SEPTIAN RACHMAN 2014731150146 EVALUASI OPTIMALISASI KINERJA PELAYANAN ANGKUTAN TAKSI DI WILAYAH KABUPATEN BANYUMAS IR. HJ. FATMAWATI OEMAR, MM. OKE
34 ZANI NURLESMANA 2014731150153 ANALISA KAPASITAS LINTAS BANDUNG – CICALENGKA IR. HJ. FATMAWATI OEMAR, MM. OKE
35 MOHAMMAD AZHARUDIN 2014731150134 MANAJEMEN DAN REKAYASA LALU LINTAS PADA PEMBANGUNAN PABRIK PAKAN TERNAK DIDAEARH SURADADI KECAMATAN GRINGSING KABUPATEN BATANG-JAWA TENGAH IR. SRI YUARTI, MT. OKE
36 ELIN MUFLIHATIN 2014731150106 MANAJEMN DAN REKAYASA LALU LINTAS RENCANA PUSAT PEMERINTAH KABUPATEN SERANG (PUSPEMKAB) IR. SRI YUNARTI, MT. OKE
37 ADE FERY DARMADI 2014731150081 PERENCANAAN LAJUR KHUSUS SEPEDA PENGHUBUNG TAMAN PANCASILA DAN TAMAN BENDOSARI IR. SRI YUNIARTI, MT. OKE
38 AGMITA LESTARI AMBARITA 2014731150083 KAITAN KARAKTERRISTIK KELUARGA TERHADAP PEMILIHAN MODA UNTUK BEKERJA DIKOTA BEKASI IR. SRI YUNIARTI, MT. OKE
39 DANI DAHNIAR 2014731150096 ANALISIS PERENCANAAN PEMBANGUNAN FASILITAS PERJALAN KAKI GAJAL MADA KOTA MOJOKERTO IR. SRI YUNIARTI, MT. OKE
40 DEVITA NURJAYANTI 2014731150097 PERENCANAAN PENGOPERASIAN BUS SEKOLAH PADA KAWASAN PENDIDIKAN DI CBR KABUPATEN CILACAP IR. SRI YUNIARTI, MT. OKE
41 ARIEF RACHMAN HAKIM 2014731150090 KINERJA JALAN DAN PENANGANAN KEMACETAN JALAN TOLE ISKANDAR DIKOTA DEPOK IR. SRI YUNIARTI, MT. OKE
42 DIAN PUTRA RUAMARGA 2014731150100 PENINGKATAN KINERJA SIMPANGAN PADA RUAS JALAN KH ABDUL HALIM DI KABUPATEN MAJALENGKA IR. SRI YUNIARTI, MT. OKE
43 ADI IMRON ROSADI 2014731150082 PENGARUH BANGKITAN DAN TARIKAN PERJALANAN BARU TERHADAP KINERJA LALU LINTAS (STUDI KASUS PEMBANGUNAN MALL METRO STATER DEPOK) IR. SRIYUNIARTI, MT. OKE
44 RONGGO WARSITO 2014731150145 ANALISA KEBUTUHAN ANGKUTAN KOMPUTER KORIDOR CIBUBUR-LEBAK BULUS IR. SUDARWATI, MM. OKE
45 DEWI AMALIA BUDIMAN 2014731150098 PENINGKATAN FASILITAS PELAYANAN STASIUN CAKUNG IR. SUDARWATI, MM. OKE
46 LAKSMI INDAH PUSPITA 2014731150125 ANALISIS KAPASITAS LINTAS JALUR KERETA API MAJA- RANGKAS BITUNG IR. SUDARWATI, MM. OKE
47 MARETA GATY WIDYASTUTI 2014731150128 ANALISIS KINERJA OPERASI KERETA API PRAMBANAN EKSPRES RELASI KUTOARJO – YOGYAKARTA – SOLO BALAPAN IR. SUDARWATI, MM. OKE
48 WENING LARASATI 2014731150150 OPTIMALISASI PERAWATAN JALAN REL DILINTAS PRUPUK-TEGAL IR. SUDARWATI, MM. OKE
49 AHMAD RIZAL KURNIAWAN 2014731150084 ANALISIS PARK&RIDE UNTUK MENDUKUNG KRL LINTAS NABGGARAI-BOGOR IR. SUDARWATI, MT. OKE
50 MEDIKO LUMBAN GAOL 2014731150130 PENINGKATAN JUMLAH ANGKUTAN KERETA API LINTAS SUKABUMI – BOGOR IR. SUDARWATI, MT. OKE
51 NUR AYUNINGSIH 2014731150137 ANALISA DAYA DUKUNG PONDASI BORE PILE PADA PROYEK TOWE3R 2 DAN 3 APARTEMEN SYNTHERIS RESIRENCE KEMANG IR. SUDARWATI, MT. OKE
52 ANDIKA BAGAS RIYADI 2014731150087 BELUM PROPOSAL
53 ANGGA DYAN RIZTYANTO 2014731150088 BELUM PROPOSAL
54 AYU FITRI WIJAYANTI 2014731150093 BELUM PROPOSAL
55 ARIESNA PUTRA CAHYA 2014731150091 MANAJEMEN DAN REKAYASA LALU LINTAS (MRLL) SEKITAR SIMPANG TUGU ADIPURA DI KOTA BANJARBARU IR. DARMADI, MM. OKE
56 DHITA AYU DAMAYANTI 2014731150099 BELUM PROPOSAL
57 ENDAH AYU PRATIWI 2014731150103 BELUM PROPOSAL
58 ESTHER PUTRI NATALLIE 2014731150107 BELUM PROPOSAL
59 EVANDER WYK 2014731150108 BELUM PROPOSAL
60 HAPPY COLA MITRA SURYA 2014731150115 BELUM PROPOSAL
61 IKHSAN TRI YANUAR 2014731150120 BELUM PROPOSAL
62 JATI KRISTIANTO 2014731150123 PROPOSAL BELUM DISETUJUI
63 LEONARD THONI B. MANURUNG 2014731150126 EVALUASI PERENCANAAN WAKTU DAN BIAYA PROYEK PEMBANGUNAN APARTEMEN CALLIA PADA PT. NUSA RAYA CIPTA IR. ERI SETIA ROMADHON, MT. OKE
64 MUHAMMAD AGUS EKO 2014731150127 ANALISIS ARUS BALIK AIR PADA SALURAN DARINASE PRIMER NGESTIHARJO DAN KARANGWUNI KABUPATEN KULONPROGO IR. DARMADI, MM. OKE
65 MIZAN DIMAS RADITYO 2014731150132 PROPOSAL BELUM DISETUJUI
66 MOCHAMAD FAISAL SUHENDI 2014731150133 PROPOSAL BELUM DISETUJUI
67 PRIYANTO SUPRAYOGI 2014731150138 PROPOSAL BELUM DISETUJUI
68 REDI ASTANTO 2014731150140 BELUM PROPOSAL
69 RISWAN OKI FERNANDO SIDABUTAR 2014731150141 EVALUASI PERHITUNGAN RENCANA ANGGARAN BIAYA (RAB) PROYEK PEMBANGUNAN APARTEMEN CALLIA PULOMAS IR. H. INDARTONO RIVAI, MM. OKE
70 ROCHMAN KURNIAWAN 2014731150142 BELUM PROPOSAL
71 ROHMA AGUSTINA 2014731150143 BELUM PROPOSAL
72 SUCIANA NURLIMARTA 2014731150148 BELUM PROPOSAL
73 YUDHA DESTAMAN 2014731150152 BELUM PROPOSAL
Catatan :
1. Syarat Tugas Akhir Nilai harus lengkap dan minimal D JAKARTA, 12 MARET 2016
2. Lunas Pembayaran Uang Kuliah sampai bulan Maret 2016 KETUA PROGRAM PLTS
3. Pelaksanaan Seminar & Sidang   Juli 2016
IR. ERI SETIA ROMADHON, MT.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s