1 08.30 – 12.00 RIZKA AMALIAH  (R) OPTIMALISASI PERCEPATAN PROYEK GEDUNG GULAKU CIKARANG BEKASI M  : IR. ERI SETIA ROMADHON, MT.
P1 : IR. H. INDARTONO RIVAI, MM.
2012731150008 P2 : IR. DARMADI, MM.
2 BUDI PRASETYO (KK) ANALISIS RENCANA ANGGARAN BIAYA DAN WAKTU PADA GEDUNG EDUCENTER (TANGERANG SELATAN) M  : IR. ERI SETIA ROMADHON, MT.
P1 : IR. DARMADI, MM.
2012731150067 P2 : IR. H. INDARTONO RIVAI, MM.
3 ARWI KURNIAWAN (KK) PERBANDINGAN BIAYA ANTARA PEMASANGAN PLAT PRECAST DAN PLAT MANUAL PADA PROYEK GEDUNG VOKASI TAHAP II UNIVERSITAS INDONESIA M  : IR. ERI SETIA ROMADHON, MT.
P1 : IR. H. INDARTONO RIVAI, MM.
2012731150066 P2 : IR. DARMADI, MM.
4 AHMAD YUSRAN ANALISIS PENGENDALIAN PROYEK KONSTRUKSI MENGACU PADA PELAKSANAAN PENJADWALAN WAKTU DENGAN METODE KONVENSIONAL DAN LINIER M  : IR. ERI SETIA ROMADHON, MT.
P1 : IR. DARMADI, MM.
2014731150085 P2 : IR. H. INDARTONO RIVAI, MM.
5 HANNA SRI AGUSTINA EMINIM SIHOMBING ANALISIS KEBUTUHAN KAPAL PADA LINTAS PENYEBERANGAN TANJUNG KALIAN TANJUNG API-API M  : IR. ERI SETIA ROMADHON, MT.
P1 : IR. H. INDARTONO RIVAI, MM.
2014731150114 P2 : IR. DARMADI, MM.
6 JATMIKO SURYA AJI PERENCANAAN STRUKTUR GEDUNG AUDITORIUM POLITEKNIK NEGERI BATAM BATAM KEPULAUAN RIAU M  : IR. ERI SETIA ROMADHON, MT.
P1 : IR. DARMADI, MM.
2014731150124 P2 : IR. H. INDARTONO RIVAI, MM.
7 ROHMATULLOH AKBAR REDESAIN STRUKTUR KOLOM DAN BALOK BETON BERTULANG PADA PROYEK GEDUNG LABORATORIUM NASIONAL BALITBANGKES JAKARTA M  : IR. ERI SETIA ROMADHON, MT.
P1 : IR. H. INDARTONO RIVAI, MM.
2014731150144 P2 : IR. DARMADI, MM.
8 HOLTER GYVER PARNINGOTAN ANALISIS PENGENDALIAN BIAYA DAN WAKTU PROYEK PEMBANGUNAN APARTEMEN SAUMATA M  : IR. ERI SETIA ROMADHON, MT.
P1 : IR. DARMADI, MM.
2014731150119 P2 : IR. H. INDARTONO RIVAI, MM.
9 DIKA HAPSANTO  (R) ESTIMASI ANGGARAN BIAYA KONSTRUKSI DAN RENCANA PEDJADWALAN TERHADAP DESAIN PADA PEMBANGUNAN KAMPUS ISLAM AL AZHAR DEPOK M  : IR. H. INDARTONO RIVAI, MM.
P1 : IR. ERI SETIA ROMADHON, MT.
2012731150014 P2 : IR. DARMADI, MM.
10 12.00 – 19.00 RIZAL NUR  (KK) PERENCANAAN KABEL DAN PRESTRESS GIRDER RAMP 3 PADA BENTANG PENDEK 20,8 METER PEMBANGUNAN JALAN TOL DEPOK ANTASARI DENGAN MENGGUNAKAN PCI GIRDER M  : IR. H. INDARTONO RIVAI, MM.
P1 : IR. DARMADI, MM.
2012731150075 P2 : IR. ERI SETIA ROMADHON, MT.
11 ARIS DARSONO  (KK) PERENCANAAN KABEL DAN PRESTRESS GIRDER JEMBATAN ANDARA PADA BENTANG PANJANG 30,15 METER PEMBANGUNAN JALAN TOL DEPOK ANTASARI DENGAN MENGGUNAKAN PCI GIRDER M  : IR. H. INDARTONO RIVAI, MM.
P1 : IR. ERI SETIA ROMADHON, MT.
2012731150065 P2 : IR. DARMADI, MM.
12 HANDA MUGUS FARIKHA (R) ANALISIS NETWORK PLANNING DENGAN CPM (CRITICAL PATH METODHE) PROYEK GEDUNG KANTOR PT.CBA SERPONG TANGERANG SELATAN M  : IR. H. INDARTONO RIVAI, MM.
P1 : IR. DARMADI, MM.
2012731150006 P2 : IR. ERI SETIA ROMADHON, MT.
13 12.00 – 19.00 DANI SYARIFUDIN A.A. (R) EVALUASI SALURAN DRAINASE PADA PERUMAHAN GRAND DEPOK CITY M  : IR. H. INDARTONO RIVAI, MM.
P1 : IR. ERI SETIA ROMADHON, MT.
2009731150003 P2 : IR. DARMADI, MM.
14 FARDHI PRATAMA PERENCANAAN STRUKTUR ATAS GEDUNG SDN KLENDER 15 PAGI DKI JAKARTA M  : IR. H. INDARTONO RIVAI, MM.
P1 : IR. DARMADI, MM.
2014731150109 P2 : IR. ERI SETIA ROMADHON, MT.
15 HENGKY DWIYATMOKO ANALISA JENIS PONDASI TIANG PANCANG PADA PROYEK APARTEMEN ELPIS RESIDANCE JAKARTA PUSAT M  : IR. H. INDARTONO RIVAI, MM.
P1 : IR. ERI SETIA ROMADHON, MT.
2014731150116 P2 : IR. DARMADI, MM.
16 ANA AMALIA ISLAMI (R) ANALISIS PERKERASAN KAKU DALAM PERENCANAAN PEMBANGUNAN JALAN TOL CIJAGO SEKSI IIA, DEPOK M  : IR. DARMADI, MM.
P1 : IR. ERI SETIA ROMADHON, MT.
2012731150009 P2 : IR. H. INDARTONO RIVAI, MM.
17 MUHAMMAD FIKRIANSYAH K. (R) PERHITUNGAN DIMENSI SALURAN DRAINASE SISI JALAN PADA JALAN TOL CINERE JAGORAWI (CIJAGO) M  : IR. DARMADI, MM.
P1 : IR. H. INDARTONO RIVAI, MM.
2012731150007 P2 : IR. ERI SETIA ROMADHON, MT.
18 YUSRI NUR (KK) EVALUASI SISTEM DRAINASE PADA RUAS GERBANG TOL PLUIT JL. TOL IR. WIYOTO WIYONO MSc. M  : IR. DARMADI, MM.
P1 : IR. ERI SETIA ROMADHON, MT.
2011731150102 P2 : IR. H. INDARTONO RIVAI, MM.
19 MEDIAR IBNU AZZAM (R) PERENCANAAN SISTEM DRAINASE PROYEK UNDERPAS JL. KEBON PEDES KOTA BOGOR JAWA BARAT M  : IR. DARMADI, MM.
P1 : IR. H. INDARTONO RIVAI, MM.
2009731150004 P2 : IR. ERI SETIA ROMADHON, MT.
JADWAL SIDANG TUGAS AKHIR PERIODE GENAP  TA 2015/2016
PROGRAM STUDI TEKNIK SIPIL LANJUTAN & KELAS KARYAWAN FTSP-UJ
HARI : SABTU  TANGGAL  20 AGUSTUS  2016
1 AIDI RAHMAN ANALISIS PERCEPATAN PROYEK DENGAN METODE LEAST COST SCHEDULING M  : IR. ERI SETIA ROMADHON, MT.
P1 : IR. DARMADI, MM.
2014731150086 P2 : IR. H. INDARTONO RIVAI, MM.
2 SYAIFUL ANWAR ANALISIS PERKUATAN STRUKTUR DENGAN FIBER REINFORCED POLYMER (FRP) PADA PROYEK GEDUNG AHU KEMENTRIAN HUKUM DAN HAM M  : IR. ERI SETIA ROMADHON, MT.
P1 : IR. DARMADI, MM.
2014731150149 P2 : IR. H. INDARTONO RIVAI, MM.
3 MAULANA RIZZAK FUADHI PERENCANAAN ULANG STRUKTUR MASJID POLITEKNIK NEGERI BATAM BATAM KEPULAUAN RIAU M  : IR. ERI SETIA ROMADHON, MT.
P1 : IR. DARMADI, MM.
2014731150129 P2 : IR. H. INDARTONO RIVAI, MM.
4 SITI NOVA NURLAIFAH MANAJEMEN DAN REKAYASA LALU LINTAS SIMPANG MANGKALAYA DAN SIMPANG CIPANAS DI KABUPATEN SUKABUMI M  : IR. ERI SETIA ROMADHON, MT.
P1 : IR. DARMADI, MM.
2014731150147 P2 : IR. H. INDARTONO RIVAI, MM.
5 PRIYANTO SUPRAYOGI ANALISA PENGGUNAAN GEOTEKTILE COMPOSITE SEBAGAI LAPISAN PERKUATAN PADA KONSTRUKSI JALAN KERETA API M  : IR. ERI SETIA ROMADHON, MT.
P1 : IR. H. INDARTONO RIVAI, MM.
2014731150138 P2 : IR. DARMADI, MM.
6 ARYANI ANALISA PEMINDAHAN KAPAL CEPAT DI PELABUHAN BOOM BARU KOTA PALEMBANG KE PELABUHAN TANJUNG API-API KABUPATEN BANYUASIN M  : IR. H. INDARTONO RIVAI, MM.
P1 : IR. ERI SETIA ROMADHON, MT.
2014731150092 P2 : IR. DARMADI, MM.
7 FEBRI ARDIANSA ANALISA KEBUTUHAN PARKING APRON PIER 1 TERMINAL 3 ULTIMATE BANDARA SOEKARNO HATTA M  : IR. H. INDARTONO RIVAI, MM.
P1 : IR. DARMADI, MM.
2014731150110 P2 : IR. ERI SETIA ROMADHON, MT.
8 HERLYANA ENDAH PRATIWI ANALISA PENINGKATAN KAPASITAS PELABUHAN PENYEBRANGAN KARIANGAU DI KOTA BALIKPAPAN PROPINSI KALIMANTAN TIMUR M  : IR. H. INDARTONO RIVAI, MM.
P1 : IR. DARMADI, MM.
2014731150118 P2 : IR. ERI SETIA ROMADHON, MT.
9 IRHAM HAFID ANALISA PERKUATAN LERENG MENGGUNAKAN SHEET PILE PADA PROYEK PEMBANGUNAN RESORT VIMALA HILLS BOGOR M  : IR. H. INDARTONO RIVAI, MM.
P1 : IR. ERI SETIA ROMADHON, MT.
2014731150122 P2 : IR. DARMADI, MM.
10 NOVITA IKE TRIYULIANI REDESAIN STRUKTUR GEDUNG 4 LANTAI RSIA AMINAH KOTA BLITAR M  : IR. H. INDARTONO RIVAI, MM.
P1 : IR. DARMADI, MM.
2014731150136 P2 : IR. ERI SETIA ROMADHON, MT.
11 CHAIRUNNISA PERENCANAAN DINDING TANAH (SOLDIER PILE) PADA PROYEK CLEVELAND SETIA BUDI BANDUNG JAWA BARAT M  : IR. DARMADI, MM.
P1 : IR. ERI SETIA ROMADHON, MT.
2014731150095 P2 : IR. H. INDARTONO RIVAI, MM.
12 EDI WIBOWO ANALISA DAYA DUKUNG PONDASI BORED PILE PADA PROYEK PEMBANGUNAN HOTEL CLEVELAND SETIABUDI BANDUNG JAWA BARAT M  : IR. DARMADI, MM.
P1 : IR. H. INDARTONO RIVAI, MM.
2014731150104 P2 : IR. ERI SETIA ROMADHON, MT.
13 HANNA SINAGA REDESAIN STRUKTUR BALOK DAN KOLOM PADA PROYEK HOTEL SAHID CLEVELAND SETIA BUDI BANDUNG M  : IR. DARMADI, MM.
P1 : IR. ERI SETIA ROMADHON, MT.
2014731150113 P2 : IR. H. INDARTONO RIVAI, MM.
14 ANGGA YANI RAHMAN KORDINASI SIMPANG 4 TOL BEKASI TIMUR , SIMPANGAN 4RS MITRA KELUARGA DAN SIMPANGA 4 UNISMA M  : IR. DARMADI, MM.
P1 : IR. H. INDARTONO RIVAI, MM.
2014731150089 P2 : IR. ERI SETIA ROMADHON, MT.
15 DIAN SETIAWAN PERENCANAAN DRAINASE KAWASAN SIMPANG JOHAR, ABDULLAH BIN NUH, SHOLEH ISKANDAR KOTA BOGOR M  : IR. DARMADI, MM.
P1 : IR. ERI SETIA ROMADHON, MT.
2014731150101 P2 : IR. H. INDARTONO RIVAI, MM.
16 IJAN SOPIAN ANALISA KONTRUKSI BREAKWATER PROYEK PEMBANGUNAN TERMINAL PETI KEMAS PENGEMBANGAN PELABUHAN TANJUNG PRIOK DI UTARA KALI BARU M  : IR. DARMADI, MM.
P1 : IR. H. INDARTONO RIVAI, MM.
2014731150121 P2 : IR. ERI SETIA ROMADHON, MT.
17 NOPOLION EKA PUTRA PERENCANAAN PERKERASAN LENTUR DENGAN  MENGGUNAKAN METODE BINAMARGA NO: 02/M/BM/2013 PADA PROYEK JL.H.DJOLE BANTAR GERBANG BEKASI M  : IR. DARMADI, MM.
P1 : IR. ERI SETIA ROMADHON, MT.
2014731150135 P2 : IR. H. INDARTONO RIVAI, MM.
18 YOGA CORNIA PRADANI KAJIAN RELOKASI TERMINAL ANGKUTAN BARANG PADA JARINGAN LINTAS ANGKUTA BARANG DIKABUPATEN PATI M  : IR. DARMADI, MM.
P1 : IR. H. INDARTONO RIVAI, MM.
2014731150151 P2 : IR. ERI SETIA ROMADHON, MT.
19 ARIESNA PUTRA CAHYA MANAJEMEN DAN REKAYASA LALULINTAS (MRLL) SEKITARAN SIMPANG TUGU ADIPURA DI KOTA BANJARBARU M  : IR. DARMADI, MM.
P1 : IR. H. INDARTONO RIVAI, MM.
2014731150091 P2 : IR. ERI SETIA ROMADHON, MT.
JADWAL SIDANG TUGAS AKHIR PERIODE GENAP  TA 2015/2016
PROGRAM STUDI TEKNIK SIPIL LANJUTAN & KELAS KARYAWAN FTSP-UJ
HARI : MINGGU   TANGGAL  14 AGUSTUS  2016
NO Jam Nama/No. Pokok Judul Tugas Akhir Penguji
1 09.00 – 09.40 HERI SETIAWAN  (KK) ANALISIS BIAYA STRUKTUR PADA PROYEK ST. MORITZ PURI KEMBANGAN AREA TOWER OFFICE M  : IR. FATMAWATI OEMAR, MM
P1 : IR. SUDARWATI, MM.
2012731150071 P2 : IR. SRI YUNIARTI, MT.
2 09.40 – 10.20 AGUS LASIMANTO  (KK) ANALISA PLAT KONVENSIONAL DENGAN PLAT HALFSLAB DITINJAU DARI SEGI BIAYA, WAKTU DAN KEBUTUHAN TENAGA KERJA M  : IR. FATMAWATI OEMAR, MM
P1 : IR. SRI YUNIARTI, MT.
2012731150064 P2 : IR. SUDARWATI, MM.
3 10.20 – 11.00 HAFIZ HADIWIRYA ANALISA PERKUATAN STRUKTUR MENGGUNAKAN FIBER REINFORCED POLYMER (FRP) PADA GEDUNG GLOBAL TV PROYEK G3TV JAKARTA M  : IR. FATMAWATI OEMAR, MM
P1 : IR. SUDARWATI, MM.
2014731150112 P2 : IR. SRI YUNIARTI, MT.
4 11.00 – 11.40 SEPTIAN RACHMAN EVALUASI OPTIMALISASI KINERJA PELAYANAN ANGKUTAN TAKSI DI WILAYAH KABUPATEN BANYUMAS M  : IR. FATMAWATI OEMAR, MM
P1 : IR. SRI YUNIARTI, MT.
2014731150146 P2 : IR. SUDARWATI, MM.
5 11.40 – 12.20 PUNGKY WIJAYA (KK) ANALISA TEBAL PERKERASAN LENTUR PADA RUAS HALIM PERDANA KUSUMA M  : IR. SUDARWATI, MM.
P1 : IR. FATMAWATI OEMAR, MM.
2012731150074 P2 : IR. SRI YUNIARTI, MT.
ISTIRAHAT
6 13.00 – 13.40 SINGTRIAS NUARI PUSPA RA (R) ANALISA DAYA DUKUNG PONDASI TIANG PANCANG PADA PROYEK PEMBANGUNAN GOODRICH ANTASARI APARTEMENT DI JAKARTA SELATAN M  : IR. SUDARWATI, MM.
P1 : IR. SRI YUNIARTI, MT.
2012731150001 P2 : IR. FATMAWATI OEMAR, MM.
7 13.40 – 14.20 DEDE SETIA LAKSANA (KK) ANALISA TEBAL PERKERASAN KAKU PADA RUAS JALAN CAKUNG – CILINCING METODE BINA MARGA (MDP 2013) M  : IR. SUDARWATI, MM.
P1 : IR. FATMAWATI OEMAR, MM.
2012731150068 P2 : IR. SRI YUNIARTI, MT.
8 14.20- 15.00 DEWI AMALIA BUDIMAN PENGARUH PENINGKATAN PELAYANAN DAN PEMBERIAN SUBSIDI KA KAMANDAKA TERHADAP PANGSA PASAR MODA KA DAN ANGKUTAN JALAN LINTAS PURWOKERTO – SEMARANG M  : IR. SUDARWATI, MM.
P1 : IR. SRI YUNIARTI, MT.
2014731150098 P2 : IR. FATMAWATI OEMAR, MM.
9 15.00 – 15.40 WENING LARASATI OPTIMALISASI PERAWATAN JALAN REL DILINTAS PRUPUK-TEGAL M  : IR. SUDARWATI, MM.
P1 : IR. FATMAWATI OEMAR, MM.
2014731150150 P2 : IR. SRI YUNIARTI, MT.
10 15.40 – 16.20 RUDI CAHYONO (KK) PERBANDINGAN BIAYA DAN WAKTU METODE PELAKSANAAN PLAT BONDEK DENGAN PLAT KONVENSIONAL PADA PROYEK KANTOR TBG OFFICE PEKANBARU AIRPORT M  : IR. SRI YUNIARTI, MT.
P1 : IR. SUDARWATI, MM.
2012731150078 P2 : IR. FATMAWATI OEMAR, MM.
11 16.20 – 17.00 HARIRI FADILLAH  (KK) PENGENDALIAN BIAYA DAN JADWAL PROYEK GEDUNG HOTEL RED PLANET PALEMBANG M  : IR. SRI YUNIARTI, MT.
P1 : IR. FATMAWATI OEMAR, MM.
2012731150070 P2 : IR. SUDARWATI, MM.
12 17.00 – 17.45 AGMITA LESTARI AMBARITA PENGEMBANGAN STASIUN KEDUNGJATI BERDASARKAN STANDAR PELAYANAN M  : IR. SRI YUNIARTI, MT.
P1 : IR. SUDARWATI, MM.
2014731150083 P2 : IR. FATMAWATI OEMAR, MM.
Ket : M   : Moderator P1 : Penguji  1 P2 : Penguji  2
1) Syarat Lunas Biaya Perkuliahah, Administrasi (Nilai) Lengkap
2) Menyerahan skripsi yang telah direvisi (3 buah) untuk penguji  2 hari sebelum sidang
3) Menyerahkan phas Foto 4×6, 3×4,  masing-masing 4 Lembar ke Bpk. Gufron
4) Untuk Pakaian Sidang : putih, hitam, jas & berdasi dan Pelepasan Berpakaian Batik
5) Pengumuman Hasil Sidang dan pelepasan tanggal 03 September 2016
6) Menyerahkan Buku Skripsi Hard Cover 3 Buah dan CD Tugas Akhir dan Sumbangan
     Buku Diktat Kuliah/Jurnal Internasional Teknik Sipil Sebelum Pengumuman Hasil Sidang

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s