JADWAL SIDANG TUGAS AKHIR 2016


JADWAL SIDANG TUGAS AKHIR PERIODE GENAP  TA 2015/2016
PROGRAM STUDI TEKNIK SIPIL LANJUTAN & KELAS KARYAWAN FTSP-UJ
HARI : SABTU  TANGGAL  13 AGUSTUS  2016
NO Jam Nama/No. Pokok Judul Tugas Akhir Penguji
1 08.30 – 12.00 RIZKA AMALIAH  (R) OPTIMALISASI PERCEPATAN PROYEK GEDUNG GULAKU CIKARANG BEKASI M  : IR. ERI SETIA ROMADHON, MT.
P1 : IR. H. INDARTONO RIVAI, MM.
2012731150008 P2 : IR. DARMADI, MM.
2 BUDI PRASETYO (KK) ANALISIS RENCANA ANGGARAN BIAYA DAN WAKTU PADA GEDUNG EDUCENTER (TANGERANG SELATAN) M  : IR. ERI SETIA ROMADHON, MT.
P1 : IR. DARMADI, MM.
2012731150067 P2 : IR. H. INDARTONO RIVAI, MM.
3 ARWI KURNIAWAN (KK) PERBANDINGAN BIAYA ANTARA PEMASANGAN PLAT PRECAST DAN PLAT MANUAL PADA PROYEK GEDUNG VOKASI TAHAP II UNIVERSITAS INDONESIA M  : IR. ERI SETIA ROMADHON, MT.
P1 : IR. H. INDARTONO RIVAI, MM.
2012731150066 P2 : IR. DARMADI, MM.
4 AHMAD YUSRAN ANALISIS PENGENDALIAN PROYEK KONSTRUKSI MENGACU PADA PELAKSANAAN PENJADWALAN WAKTU DENGAN METODE KONVENSIONAL DAN LINIER M  : IR. ERI SETIA ROMADHON, MT.
P1 : IR. DARMADI, MM.
2014731150085 P2 : IR. H. INDARTONO RIVAI, MM.
5 HANNA SRI AGUSTINA EMINIM SIHOMBING ANALISIS KEBUTUHAN KAPAL PADA LINTAS PENYEBERANGAN TANJUNG KALIAN TANJUNG API-API M  : IR. ERI SETIA ROMADHON, MT.
P1 : IR. H. INDARTONO RIVAI, MM.
2014731150114 P2 : IR. DARMADI, MM.
6 JATMIKO SURYA AJI PERENCANAAN STRUKTUR GEDUNG AUDITORIUM POLITEKNIK NEGERI BATAM BATAM KEPULAUAN RIAU M  : IR. ERI SETIA ROMADHON, MT.
P1 : IR. DARMADI, MM.
2014731150124 P2 : IR. H. INDARTONO RIVAI, MM.
7 ROHMATULLOH AKBAR REDESAIN STRUKTUR KOLOM DAN BALOK BETON BERTULANG PADA PROYEK GEDUNG LABORATORIUM NASIONAL BALITBANGKES JAKARTA M  : IR. ERI SETIA ROMADHON, MT.
P1 : IR. H. INDARTONO RIVAI, MM.
2014731150144 P2 : IR. DARMADI, MM.
8 HOLTER GYVER PARNINGOTAN ANALISIS PENGENDALIAN BIAYA DAN WAKTU PROYEK PEMBANGUNAN APARTEMEN SAUMATA M  : IR. ERI SETIA ROMADHON, MT.
P1 : IR. DARMADI, MM.
2014731150119 P2 : IR. H. INDARTONO RIVAI, MM.
9 DIKA HAPSANTO  (R) ESTIMASI ANGGARAN BIAYA KONSTRUKSI DAN RENCANA PEDJADWALAN TERHADAP DESAIN PADA PEMBANGUNAN KAMPUS ISLAM AL AZHAR DEPOK M  : IR. H. INDARTONO RIVAI, MM.
P1 : IR. ERI SETIA ROMADHON, MT.
2012731150014 P2 : IR. DARMADI, MM.
10 12.00 – 19.00 RIZAL NUR  (KK) PERENCANAAN KABEL DAN PRESTRESS GIRDER RAMP 3 PADA BENTANG PENDEK 20,8 METER PEMBANGUNAN JALAN TOL DEPOK ANTASARI DENGAN MENGGUNAKAN PCI GIRDER M  : IR. H. INDARTONO RIVAI, MM.
P1 : IR. DARMADI, MM.
2012731150075 P2 : IR. ERI SETIA ROMADHON, MT.
11 ARIS DARSONO  (KK) PERENCANAAN KABEL DAN PRESTRESS GIRDER JEMBATAN ANDARA PADA BENTANG PANJANG 30,15 METER PEMBANGUNAN JALAN TOL DEPOK ANTASARI DENGAN MENGGUNAKAN PCI GIRDER M  : IR. H. INDARTONO RIVAI, MM.
P1 : IR. ERI SETIA ROMADHON, MT.
2012731150065 P2 : IR. DARMADI, MM.
12 HANDA MUGUS FARIKHA (R) ANALISIS NETWORK PLANNING DENGAN CPM (CRITICAL PATH METODHE) PROYEK GEDUNG KANTOR PT.CBA SERPONG TANGERANG SELATAN M  : IR. H. INDARTONO RIVAI, MM.
P1 : IR. DARMADI, MM.
2012731150006 P2 : IR. ERI SETIA ROMADHON, MT.
13 12.00 – 19.00 DANI SYARIFUDIN A.A. (R) EVALUASI SALURAN DRAINASE PADA PERUMAHAN GRAND DEPOK CITY M  : IR. H. INDARTONO RIVAI, MM.
P1 : IR. ERI SETIA ROMADHON, MT.
2009731150003 P2 : IR. DARMADI, MM.
14 FARDHI PRATAMA PERENCANAAN STRUKTUR ATAS GEDUNG SDN KLENDER 15 PAGI DKI JAKARTA M  : IR. H. INDARTONO RIVAI, MM.
P1 : IR. DARMADI, MM.
2014731150109 P2 : IR. ERI SETIA ROMADHON, MT.
15 HENGKY DWIYATMOKO ANALISA JENIS PONDASI TIANG PANCANG PADA PROYEK APARTEMEN ELPIS RESIDANCE JAKARTA PUSAT M  : IR. H. INDARTONO RIVAI, MM.
P1 : IR. ERI SETIA ROMADHON, MT.
2014731150116 P2 : IR. DARMADI, MM.
16 ANA AMALIA ISLAMI (R) ANALISIS PERKERASAN KAKU DALAM PERENCANAAN PEMBANGUNAN JALAN TOL CIJAGO SEKSI IIA, DEPOK M  : IR. DARMADI, MM.
P1 : IR. ERI SETIA ROMADHON, MT.
2012731150009 P2 : IR. H. INDARTONO RIVAI, MM.
17 MUHAMMAD FIKRIANSYAH K. (R) PERHITUNGAN DIMENSI SALURAN DRAINASE SISI JALAN PADA JALAN TOL CINERE JAGORAWI (CIJAGO) M  : IR. DARMADI, MM.
P1 : IR. H. INDARTONO RIVAI, MM.
2012731150007 P2 : IR. ERI SETIA ROMADHON, MT.
18 YUSRI NUR (KK) EVALUASI SISTEM DRAINASE PADA RUAS GERBANG TOL PLUIT JL. TOL IR. WIYOTO WIYONO MSc. M  : IR. DARMADI, MM.
P1 : IR. ERI SETIA ROMADHON, MT.
2011731150102 P2 : IR. H. INDARTONO RIVAI, MM.
19 MEDIAR IBNU AZZAM (R) PERENCANAAN SISTEM DRAINASE PROYEK UNDERPAS JL. KEBON PEDES KOTA BOGOR JAWA BARAT M  : IR. DARMADI, MM.
P1 : IR. H. INDARTONO RIVAI, MM.
2009731150004 P2 : IR. ERI SETIA ROMADHON, MT.
JADWAL SIDANG TUGAS AKHIR PERIODE GENAP  TA 2015/2016
PROGRAM STUDI TEKNIK SIPIL LANJUTAN & KELAS KARYAWAN FTSP-UJ
HARI : SABTU  TANGGAL  20 AGUSTUS  2016
1 AIDI RAHMAN ANALISIS PERCEPATAN PROYEK DENGAN METODE LEAST COST SCHEDULING M  : IR. ERI SETIA ROMADHON, MT.
P1 : IR. DARMADI, MM.
2014731150086 P2 : IR. H. INDARTONO RIVAI, MM.
2 SYAIFUL ANWAR ANALISIS PERKUATAN STRUKTUR DENGAN FIBER REINFORCED POLYMER (FRP) PADA PROYEK GEDUNG AHU KEMENTRIAN HUKUM DAN HAM M  : IR. ERI SETIA ROMADHON, MT.
P1 : IR. DARMADI, MM.
2014731150149 P2 : IR. H. INDARTONO RIVAI, MM.
3 MAULANA RIZZAK FUADHI PERENCANAAN ULANG STRUKTUR MASJID POLITEKNIK NEGERI BATAM BATAM KEPULAUAN RIAU M  : IR. ERI SETIA ROMADHON, MT.
P1 : IR. DARMADI, MM.
2014731150129 P2 : IR. H. INDARTONO RIVAI, MM.
4 SITI NOVA NURLAIFAH MANAJEMEN DAN REKAYASA LALU LINTAS SIMPANG MANGKALAYA DAN SIMPANG CIPANAS DI KABUPATEN SUKABUMI M  : IR. ERI SETIA ROMADHON, MT.
P1 : IR. DARMADI, MM.
2014731150147 P2 : IR. H. INDARTONO RIVAI, MM.
5 PRIYANTO SUPRAYOGI ANALISA PENGGUNAAN GEOTEKTILE COMPOSITE SEBAGAI LAPISAN PERKUATAN PADA KONSTRUKSI JALAN KERETA API M  : IR. ERI SETIA ROMADHON, MT.
P1 : IR. H. INDARTONO RIVAI, MM.
2014731150138 P2 : IR. DARMADI, MM.
6 ARYANI ANALISA PEMINDAHAN KAPAL CEPAT DI PELABUHAN BOOM BARU KOTA PALEMBANG KE PELABUHAN TANJUNG API-API KABUPATEN BANYUASIN M  : IR. H. INDARTONO RIVAI, MM.
P1 : IR. ERI SETIA ROMADHON, MT.
2014731150092 P2 : IR. DARMADI, MM.
7 FEBRI ARDIANSA ANALISA KEBUTUHAN PARKING APRON PIER 1 TERMINAL 3 ULTIMATE BANDARA SOEKARNO HATTA M  : IR. H. INDARTONO RIVAI, MM.
P1 : IR. DARMADI, MM.
2014731150110 P2 : IR. ERI SETIA ROMADHON, MT.
8 HERLYANA ENDAH PRATIWI ANALISA PENINGKATAN KAPASITAS PELABUHAN PENYEBRANGAN KARIANGAU DI KOTA BALIKPAPAN PROPINSI KALIMANTAN TIMUR M  : IR. H. INDARTONO RIVAI, MM.
P1 : IR. DARMADI, MM.
2014731150118 P2 : IR. ERI SETIA ROMADHON, MT.
9 IRHAM HAFID ANALISA PERKUATAN LERENG MENGGUNAKAN SHEET PILE PADA PROYEK PEMBANGUNAN RESORT VIMALA HILLS BOGOR M  : IR. H. INDARTONO RIVAI, MM.
P1 : IR. ERI SETIA ROMADHON, MT.
2014731150122 P2 : IR. DARMADI, MM.
10 NOVITA IKE TRIYULIANI REDESAIN STRUKTUR GEDUNG 4 LANTAI RSIA AMINAH KOTA BLITAR M  : IR. H. INDARTONO RIVAI, MM.
P1 : IR. DARMADI, MM.
2014731150136 P2 : IR. ERI SETIA ROMADHON, MT.
11 CHAIRUNNISA PERENCANAAN DINDING TANAH (SOLDIER PILE) PADA PROYEK CLEVELAND SETIA BUDI BANDUNG JAWA BARAT M  : IR. DARMADI, MM.
P1 : IR. ERI SETIA ROMADHON, MT.
2014731150095 P2 : IR. H. INDARTONO RIVAI, MM.
12 EDI WIBOWO ANALISA DAYA DUKUNG PONDASI BORED PILE PADA PROYEK PEMBANGUNAN HOTEL CLEVELAND SETIABUDI BANDUNG JAWA BARAT M  : IR. DARMADI, MM.
P1 : IR. H. INDARTONO RIVAI, MM.
2014731150104 P2 : IR. ERI SETIA ROMADHON, MT.
13 HANNA SINAGA REDESAIN STRUKTUR BALOK DAN KOLOM PADA PROYEK HOTEL SAHID CLEVELAND SETIA BUDI BANDUNG M  : IR. DARMADI, MM.
P1 : IR. ERI SETIA ROMADHON, MT.
2014731150113 P2 : IR. H. INDARTONO RIVAI, MM.
14 ANGGA YANI RAHMAN KORDINASI SIMPANG 4 TOL BEKASI TIMUR , SIMPANGAN 4RS MITRA KELUARGA DAN SIMPANGA 4 UNISMA M  : IR. DARMADI, MM.
P1 : IR. H. INDARTONO RIVAI, MM.
2014731150089 P2 : IR. ERI SETIA ROMADHON, MT.
15 DIAN SETIAWAN PERENCANAAN DRAINASE KAWASAN SIMPANG JOHAR, ABDULLAH BIN NUH, SHOLEH ISKANDAR KOTA BOGOR M  : IR. DARMADI, MM.
P1 : IR. ERI SETIA ROMADHON, MT.
2014731150101 P2 : IR. H. INDARTONO RIVAI, MM.
16 IJAN SOPIAN ANALISA KONTRUKSI BREAKWATER PROYEK PEMBANGUNAN TERMINAL PETI KEMAS PENGEMBANGAN PELABUHAN TANJUNG PRIOK DI UTARA KALI BARU M  : IR. DARMADI, MM.
P1 : IR. H. INDARTONO RIVAI, MM.
2014731150121 P2 : IR. ERI SETIA ROMADHON, MT.
17 NOPOLION EKA PUTRA PERENCANAAN PERKERASAN LENTUR DENGAN  MENGGUNAKAN METODE BINAMARGA NO: 02/M/BM/2013 PADA PROYEK JL.H.DJOLE BANTAR GERBANG BEKASI M  : IR. DARMADI, MM.
P1 : IR. ERI SETIA ROMADHON, MT.
2014731150135 P2 : IR. H. INDARTONO RIVAI, MM.
18 YOGA CORNIA PRADANI KAJIAN RELOKASI TERMINAL ANGKUTAN BARANG PADA JARINGAN LINTAS ANGKUTA BARANG DIKABUPATEN PATI M  : IR. DARMADI, MM.
P1 : IR. H. INDARTONO RIVAI, MM.
2014731150151 P2 : IR. ERI SETIA ROMADHON, MT.
19 ARIESNA PUTRA CAHYA MANAJEMEN DAN REKAYASA LALULINTAS (MRLL) SEKITARAN SIMPANG TUGU ADIPURA DI KOTA BANJARBARU M  : IR. DARMADI, MM.
P1 : IR. H. INDARTONO RIVAI, MM.
2014731150091 P2 : IR. ERI SETIA ROMADHON, MT.
JADWAL SIDANG TUGAS AKHIR PERIODE GENAP  TA 2015/2016
PROGRAM STUDI TEKNIK SIPIL LANJUTAN & KELAS KARYAWAN FTSP-UJ
HARI : MINGGU   TANGGAL  14 AGUSTUS  2016
NO Jam Nama/No. Pokok Judul Tugas Akhir Penguji
1 09.00 – 09.40 HERI SETIAWAN  (KK) ANALISIS BIAYA STRUKTUR PADA PROYEK ST. MORITZ PURI KEMBANGAN AREA TOWER OFFICE M  : IR. FATMAWATI OEMAR, MM
P1 : IR. SUDARWATI, MM.
2012731150071 P2 : IR. SRI YUNIARTI, MT.
2 09.40 – 10.20 AGUS LASIMANTO  (KK) ANALISA PLAT KONVENSIONAL DENGAN PLAT HALFSLAB DITINJAU DARI SEGI BIAYA, WAKTU DAN KEBUTUHAN TENAGA KERJA M  : IR. FATMAWATI OEMAR, MM
P1 : IR. SRI YUNIARTI, MT.
2012731150064 P2 : IR. SUDARWATI, MM.
3 10.20 – 11.00 HAFIZ HADIWIRYA ANALISA PERKUATAN STRUKTUR MENGGUNAKAN FIBER REINFORCED POLYMER (FRP) PADA GEDUNG GLOBAL TV PROYEK G3TV JAKARTA M  : IR. FATMAWATI OEMAR, MM
P1 : IR. SUDARWATI, MM.
2014731150112 P2 : IR. SRI YUNIARTI, MT.
4 11.00 – 11.40 SEPTIAN RACHMAN EVALUASI OPTIMALISASI KINERJA PELAYANAN ANGKUTAN TAKSI DI WILAYAH KABUPATEN BANYUMAS M  : IR. FATMAWATI OEMAR, MM
P1 : IR. SRI YUNIARTI, MT.
2014731150146 P2 : IR. SUDARWATI, MM.
5 11.40 – 12.20 PUNGKY WIJAYA (KK) ANALISA TEBAL PERKERASAN LENTUR PADA RUAS HALIM PERDANA KUSUMA M  : IR. SUDARWATI, MM.
P1 : IR. FATMAWATI OEMAR, MM.
2012731150074 P2 : IR. SRI YUNIARTI, MT.
ISTIRAHAT
6 13.00 – 13.40 SINGTRIAS NUARI PUSPA RA (R) ANALISA DAYA DUKUNG PONDASI TIANG PANCANG PADA PROYEK PEMBANGUNAN GOODRICH ANTASARI APARTEMENT DI JAKARTA SELATAN M  : IR. SUDARWATI, MM.
P1 : IR. SRI YUNIARTI, MT.
2012731150001 P2 : IR. FATMAWATI OEMAR, MM.
7 13.40 – 14.20 DEDE SETIA LAKSANA (KK) ANALISA TEBAL PERKERASAN KAKU PADA RUAS JALAN CAKUNG – CILINCING METODE BINA MARGA (MDP 2013) M  : IR. SUDARWATI, MM.
P1 : IR. FATMAWATI OEMAR, MM.
2012731150068 P2 : IR. SRI YUNIARTI, MT.
8 14.20- 15.00 DEWI AMALIA BUDIMAN PENGARUH PENINGKATAN PELAYANAN DAN PEMBERIAN SUBSIDI KA KAMANDAKA TERHADAP PANGSA PASAR MODA KA DAN ANGKUTAN JALAN LINTAS PURWOKERTO – SEMARANG M  : IR. SUDARWATI, MM.
P1 : IR. SRI YUNIARTI, MT.
2014731150098 P2 : IR. FATMAWATI OEMAR, MM.
9 15.00 – 15.40 WENING LARASATI OPTIMALISASI PERAWATAN JALAN REL DILINTAS PRUPUK-TEGAL M  : IR. SUDARWATI, MM.
P1 : IR. FATMAWATI OEMAR, MM.
2014731150150 P2 : IR. SRI YUNIARTI, MT.
10 15.40 – 16.20 RUDI CAHYONO (KK) PERBANDINGAN BIAYA DAN WAKTU METODE PELAKSANAAN PLAT BONDEK DENGAN PLAT KONVENSIONAL PADA PROYEK KANTOR TBG OFFICE PEKANBARU AIRPORT M  : IR. SRI YUNIARTI, MT.
P1 : IR. SUDARWATI, MM.
2012731150078 P2 : IR. FATMAWATI OEMAR, MM.
11 16.20 – 17.00 HARIRI FADILLAH  (KK) PENGENDALIAN BIAYA DAN JADWAL PROYEK GEDUNG HOTEL RED PLANET PALEMBANG M  : IR. SRI YUNIARTI, MT.
P1 : IR. FATMAWATI OEMAR, MM.
2012731150070 P2 : IR. SUDARWATI, MM.
12 17.00 – 17.45 AGMITA LESTARI AMBARITA PENGEMBANGAN STASIUN KEDUNGJATI BERDASARKAN STANDAR PELAYANAN M  : IR. SRI YUNIARTI, MT.
P1 : IR. SUDARWATI, MM.
2014731150083 P2 : IR. FATMAWATI OEMAR, MM.
Ket : M   : Moderator P1 : Penguji  1 P2 : Penguji  2
1) Syarat Lunas Biaya Perkuliahah, Administrasi (Nilai) Lengkap
2) Menyerahan skripsi yang telah direvisi (3 buah) untuk penguji  2 hari sebelum sidang
3) Menyerahkan phas Foto 4×6, 3×4,  masing-masing 4 Lembar ke Bpk. Gufron
4) Untuk Pakaian Sidang : putih, hitam, jas & berdasi dan Pelepasan Berpakaian Batik
5) Pengumuman Hasil Sidang dan pelepasan tanggal 03 September 2016
6) Menyerahkan Buku Skripsi Hard Cover 3 Buah dan CD Tugas Akhir dan Sumbangan
     Buku Diktat Kuliah/Jurnal Internasional Teknik Sipil Sebelum Pengumuman Hasil Sidang

UJIAN TENGAH SEMESTER – APLIKASI KOMPUTER SAP2000


Bagi mahasiswa yang  mengambil mata kuliah SAP2000, maka

agar medownload soal  UTS sebagai berikut

  1. Bagi yang ingin  mendapat nilai  A tanpa HARUS IKUT  ujian akhir dapat mengerjakan pilihan soal yang terakhir
  2. Petunjuk pengerjaan soal …………………………………………………………………………..                          Analisa Struktur Jembatan RANGKA dengan SAP2000 versi 14   
  3. Analisi jembatan beton dengan-sap-2000-jembatan-sarjito-bridge-sap2000
  4. Soal ujian UTS  sesuai nomor absen ………………………..                                 tugasSAP2000 th2016
  5. Untuk soal yang jembatan prestressed anda boleh menggunakan software SAP2000 atau MIDAS2011  atau TEKLA atau software lain yang kompeten  ……

 

JAWABAN UJIAN INI DIKUMPULKAN PALING LAMBAT 3 – MINGGU SEBELUM UJIAN AKHIR SEMESTER ,

Selamat berkarya …