UNTUK ANGKATAN 40, BERIKUT INI ADALAH
DAFTAR PEMBIMBING TUGAS AKHIR
BAGI YANG SUDAH SIAP SEGERA ASISTENSI KE PEMBIMBING MASING-MASING
SEHINGGA AKAN CEPAT PENYELESAIANNYA.
segera asistensi ke pembimbing masing-masing untuk langkah selanjutnya
download di sini daftar-pembimbing-ta-39
1 | BERIZKA ARDANIS | 2015731150047 | PERANCANGAN SISTEM DRAINASE BARU JALAN KALIMANTAN KOTA GRESIK | Ir. Darmadi, MM | OKE |
2 | BESTEN JOYMEN | 2015731150048 | ANALISIS PERBANDINGAN BIAYA PELAKSANAAN PONDASI CORRUGATED CONCRETE SHEET PILE DAN BORE PILE PADA LERENG SUTET KOTA DELTAMAS | Ir. Darmadi, MM | OKE |
3 | HANNIF ARIASTO RAHARJO | 2015731150064 | PERANCANGAN PERBAIKAN SERVICE ROAD AREA TERMINAL KARGO DI BANDARA SOEKARNO-HATTA | Ir. Darmadi, MM | OKE |
4 | JHON POLTAK RIZKY SIMAMORA | 2015731150069 | PERANCANGAN PELEBARAN SALURAN DRAINASE AIRSIDE DI BANDARA HALIM PERDANA KUSUMA | Ir. Darmadi, MM | OKE |
5 | MUHAMMAD LUTHFI | 2015731150074 | PERANCANGAN PONDASI TOWER SST 42 M | Ir. Darmadi, MM | OKE |
6 | RAJA UMAR | 2015731150077 | ANALISIS PERENCANAAN STRUKTUR BENDUNG TETAP GUNUNG NAGO KOTA PADANG | Ir. Darmadi, MM | OKE |
7 | SARAH ADISTIA SORAYA | 2015731150082 | ANALISIS DEBIT BANJIR PADA NORMALISASI KALI KRUKUT RUAS RENGAS HINGGA MESEUM WIDYA CHANDRA | Ir. Darmadi, MM | (-) Baja |
8 | BUDIMAN OKTOPRANA | 2014731150049 | PERANCANGAN DIMENSI SALURAN DRAINASE CLUSTER MISSISSIPPI JAKARTA GARDEN CITY CAKUNG JAKARTA TIMUR – DKI JAKARTA | Ir. Darmadi, MM | (-) Matrikulasi: Statika, Mek. Bahan, Mek, Fluida |
9 | ABDI DZIL IKRAM | 2015731150041 | ESTIMASI DAN CASH FLOW PEKERJAAN STRUKTUR PONDASI PROYEK HOTEL LE PREMIERE KOTA DELTAMAS | Ir. Eri Setia Romadhon, MT | OKE |
10 | APIF NUR IMAM | 2015731150043 | PERHITUNGAN VOLUME PEKERJAAN STRUKTUR PADA BANGUNAN GEDUNG DENGAN MENGGUNAKAN SOFTWARE MODELLING UNTUK MENDAPATKAN NILAI EFISIENSI BIAYA PROYEK | Ir. Eri Setia Romadhon, MT | OKE |
11 | BIERDE BIEDENKOPF GIEOVANDO | 2015731150049 | PENGENDALIAN PROYEK PEMBANGUNAN SEKOLAH AL AZHAR TAHAP II SUMMARECON BEKASI | Ir. Eri Setia Romadhon, MT | OKE |
12 | DERIANSYAH ABDULLAH | 2015731150053 | PERANCANGAN PERKERASAN LENUR TAXIWAY NC3 UNTUK JENIS PESAWAT AIRBUS B747-400 DI BANDARA SOEKARNO – HATTA | Ir. Eri Setia Romadhon, MT | (-) Jembatan |
14 | MUHAMAD AULIA ARASY | 2015731150072 | PERHITUNGAN ANGGARAN BIAYA PROYEK PERUMAHAN SERPONG LAGOON TYPE 84 | Ir. Eri Setia Romadhon, MT | OKE |
15 | RHIDWHAN FADHEL ARIP RIZQHIAL | 2015731150079 | PERHITUNGAN LINTASAN KRITIS PADA PROYEK PEMBANGUNAN APARTEMEN MARIGOLD NAVA PARK – BSD CITY | Ir. Eri Setia Romadhon, MT | OKE |
16 | SITI RAHMAWATI | 2015731150086 | RANCANGAN CAMPURAN BETON MUTU TINGGI DENGAN PENAMBAHAN ADMIXTURE HIGH-SUPERPLASTISIZER & RETARDER PADA PROYEK TAMAN ANGGREK RESIDENCE | Ir. Eri Setia Romadhon, MT | OKE |
17 | LEONARD THONI B. MANURUNG | 2014731150121 | ANALISIS PERCEPATAN PEMBANGUNAN PROYEK JEMBATAN PENYEBERANGAN ORANG (JPO) KOTA DEPOK | Ir. Eri Setia Romadhon, MT | OKE |
45 | RIOLAN SAGALA | 2015731150080 | ANALISIS PENGARUH VARIASI DIMENSI KOLOM TERHADAP KINERJA BATAS LAYAN DAN KINERJA BATAS ULTIMIT PADA PORTAL GEDUNG 5 LANTAI DI DAERAH RAWAN GEMPA YANG MENGACU PADA SNI 03-1726-2002 | Ir. Eri Setia Romadhon, MT | (-) Mat.Jalan |
18 | BANI PRATAMA | 2015731150045 | EVALUASI PEMBANGUNAN PERMUKIMAN DITINJAU DARI ASPEK BIAYA, WAKTU DAN MANAJEMEN STUDI KASUS: PEMBANGUNAN RUMAH TINGGAL ORCHARD PARK BATAM | Ir. Fatmawati Oemar, MM | OKE |
19 | DIANTO NUR UTOMO | 2015731150055 | PERBANDINGAN BIAYA SEWA BEKISTING PERI SYSTEM PADA PROYEK HOTEL GRAND CLASIC CIKARANG DENGAN BEKISTING KONVENSIONAL | Ir. Fatmawati Oemar, MM | OKE |
20 | FIRMAN RIZKY ANNANDA | 2015731150062 | ANALISIS KELONGSORAN PADA TEBING SUNGAI CILIWUNG DI PERUMAHAN PESONA KHAYANGAN DEPOK | Ir. Fatmawati Oemar, MM | OKE |
21 | IPNU SUPRIYANTO | 2015731150067 | PENINGKATAN PELAYANAN RUAS JALAN PADA JALAN RAYA PASAR MINGGU, JAKARTA SELATAN | Ir. Fatmawati Oemar, MM | OKE |
22 | JANNE ASTRIA BANJAR NAHOR | 2015731150068 | PERANCANGAN EAST CROSS TAXIWAY DI BANDARA SOEKARNO-HATTA | Ir. Fatmawati Oemar, MM | OKE |
23 | SABIRIN | 2015731150081 | PERANCANGAN PERPANJANGAN TAXIWAY NP1 PROYEK BANDARA SOEKARNO-HATTA KOTA TANGERANG | Ir. Fatmawati Oemar, MM | (-) Jembatan |
24 | SIGIT WURYANTO | 2015731150085 | PERHITUNGAN RENCANA ANGGARAN PELASANAAN PEMBANGUNAN GEDUNG LABORATORIUM KEMENTRIAN PERHUBUNGAN | Ir. Fatmawati Oemar, MM | (-) Matrik, Jembatan, Prategang |
25 | ANISA TAQIATUN BARI’AH | 2015731150042 | PERHITUNGAN WAKTU DAN ANGGARAN BIAYA PELASANAAN PROYEK BIOGAS TEPUNG TAPIOKA | Ir. Indartono Rivai, MM | OKE |
26 | CHRISTINA ADATTA SITORUS | 2015731150052 | PENANGANAN KAWASAN KUMUH MENGACU PADA PERATURAN MENTERI PEKERJAAN UMUM NO.1 TAHUN 2014 (LOKASI?) | Ir. Indartono Rivai, MM | (-) Mek. Fluida, Statika |
27 | DICKY WIJAYA | 2015731150056 | PERANCANGAN FLEXIBLE PAVEMENT TAXIWAY NCW UNTUK JENIS PESAWAT AIRBUS A380-800 DI BANDARA SOEKARNO-HATTA | Ir. Indartono Rivai, MM | OKE |
28 | FERDIA SUSANTI | 2015731150060 | PENGENDALIAN WAKTU DAN BIAYA BEKISTING SYSTEM PERI UP PADA PROYEK RS ADMAJAYA JAKARTA | Ir. Indartono Rivai, MM | OKE |
29 | NUR ULFAH BAHRI HALIM | 2015731150076 | EFEKTIVITAS PENGGUNAAN TOWER CRANE PADA PROYEK PROJECT DISTRICT 8 LOT 28 | Ir. Indartono Rivai, MM | OKE |
30 | TITO SUCIPTO | 2015731150088 | ANALISIS BIAYA DAN WAKTU BEKISTING VERTIKAL SISTEM ENKOFORM V-100 PROYEK GRAND MANSION APARTMENT JAKARTA | Ir. Indartono Rivai, MM | OKE |
31 | TRIANDY BAYU PRIHASTONO | 2015731150090 | ANALISIS PERBANDINGAN WAKTU DAN BIAYA BEKISTING PELAT BALOK PADA GREEN PRAMUKA CITY TOWER MAGNOLIA | Ir. Indartono Rivai, MM | OKE |
32 | YANE KINANTI DE YOLA NULE | 2015731150095 | PERANCANGAN PERLUASAN APRON AREA KARGO DI BANDARA SOEKARNO-HATTA | Ir. Indartono Rivai, MM | OKE |
33 | HENDRI SUJADMIKO | 2014731150059 | PRODUKTIVITAS ALAT BERAT DALAM PEKERJAAN GALIAN PADA PROYEK PEMBANGUNAN GEDUNG PELAYANAN KESEHATAN RS St.CAROLUS, JAKARTA PUSAT | Ir. Indartono Rivai, MM | (-) Matrikulasi: Statika, Mek. Bahan, Mek, Fluida |
34 | RISWAN OKI FERNANDO SIDABUTAR | 2014731150141 | PERHITUNGAN RENCANA ANGGARAN PELAKSANAAN (RAP) PROYEK PEMBANGUNAN APARTEMEN THE GREEN PRAMUKA RESIDENCE TOWER ORCHID | Ir. Indartono Rivai, MM | OKE |
35 | FAJAR YUSUF ARDANI | 2015731150058 | ANALISIS KEBUTUHAN PARKING STAND APRON PIER 2 TEMINAL 3 ULTIMATE BANDARA SOEKARNO-HATTA | Ir. Sri Yuniarti, MT | OKE |
36 | HERIS CAHYA KUSUMA | 2015731150065 | OPTIMASI PENANGANAN DAMPAK RENCANA PEMBANGUNAN SPBU SHELL DI KOTA TANGERANG SELATAN | Ir. Sri Yuniarti, MT | (-) Mek. Bahan |
37 | LUTHFIANA SARI DEWI | 2015731150071 | ANALISIS ANALISIS DAMPAK LALU LINTAS PEMBANGUNAN APARTEMEN GREEN HILLS (LOKASI?) | Ir. Sri Yuniarti, MT | (-) Mek. Bahan |
38 | RATNA DEWI SARTIKA | 2015731150078 | ANALISIS PENINGKATAN KESELAMATAN PADA PERLINTASAN SEBIDANG JPL NO.81 BEKASI | Ir. Sri Yuniarti, MT | OKE |
39 | YUDA MANDALA PUTRA C | 2015731150097 | PERANCANGAN PEMBUATAN APRON B73 TERMINAL 1 BANDAR UDARA INTERNASIONAL SOEKARNO-HATTA | Ir. Sri Yuniarti, MT | (-) 6 MK (Harus Kuliah) |
40 | AYU FITRI WIJAYANTI | 2014731150093 | ANALISIS ANGKUTAN BARANG DI KECAMATAN CICURUG KABUPATEN SUKABUMI | Ir. Sri Yuniarti, MT | (-) Statika |
41 | SANDY RIMAWAN | 2014731150072 | ANALISIS DAN REKAYASA PERSIMPANGAN SGC CIKARANG DI KABUPATEN BEKASI | Ir. Sri Yuniarti, MT | OKE |
13 | GABE PARDAMEAN SIDABUTAR | 2015731150063 | EVALUASI PROYEK PEMBANGUNAN KANTOR KELURAHAN PONDOK BETUNG DENGAN MENGGUNAKAN MS.PROJECT | Ir. Sudarwati, MM | (-) Mek. Bahan |
42 | BUDI DERMAWAN | 2015731150050 | ANALISIS BIAYA DAN WAKTU METODE PELAKSANAAN PEKERJAAN SALURAN BETON PRECAST ON SITE DAN SALURAN BETON KONVENSIONAL PADA PROYEK POS LINTAS NEGARA ENTIKONG | Ir. Sudarwati, MM | OKE |
43 | CAECILIA PATRICIA YOLANDA | 2015731150051 | PERANCANGAN PERLUASAN APRON NSA DI TERMINAL 1 BANDARA SOEKARNO-HATTA | Ir. Sudarwati, MM | OKE |
44 | MUHAMMAD MUGHNY HALIM | 2015731150073 | PERANCANGAN KADAR ASPAL OPTIMUM PADA LAPIS AUS (AC-WC) PROYEK PEMELIHARAAN JALAN TOL CAWANG-TOMANG-CENGKARENG | Ir. Sudarwati, MM | OKE |
46 | UMAMUL HUSEN | 2015731150091 | ANALISIS PERKERASAN LAPANGAN PARKIR KENDARAAN DI LOKSI M-1 BANDARA SOEKARNO-HATTA | Ir. Sudarwati, MM | OKE |
47 | RIZALDY FEBRIYANTO | 2012731150175 | ANALISIS BIAYA PELAT LANTAI SISTEM HOLLOW CORE SLAB (HCS) DENGAN PELAT LANTAI KONVENSIONAL PADA BANGUNAN SECONDARY BUILDING PT. HM SAMPOERNA PROJECT KARAWANG | Ir. Sudarwati, MM | (-) Man.Kon, Etika Profesi |
48 | RUDDY HADI PRIANSAH | 2012731150141 | PERBAIKAN TANAH DASAR DENGAN METODE CTRB PADA JALAN MALINGPING – BAYAH KAB. LEBAK | Ir. Sudarwati, MM | OKE |
49 | BAMBANG PURWANTO AGUS SAPUTRO | 2015731150044 | BELUM PROPOSAL | ||
50 | BENN HUDSON | 2015731150046 | BELUM PROPOSAL | ||
51 | DEVI APRILIA SARI | 2015731150054 | BELUM PROPOSAL | ||
52 | ERWIN PARLINDUNGAN | 2015731150057 | BELUM PROPOSAL | ||
53 | FARIS WIDYANTO | 2015731150059 | BELUM PROPOSAL | ||
54 | FERNANDO TUA BUTAR BUTAR | 2015731150061 | BELUM PROPOSAL | ||
55 | ICHSAN ADITYA | 2015731150066 | BELUM PROPOSAL | ||
56 | KURNIAWAN BIMA PRAKOSO | 2015731150070 | BELUM PROPOSAL | ||
57 | NATAL GUNANTA PURBA | 2015731150075 | BELUM PROPOSAL | ||
58 | SHINTA RATNA AFIANINGRUM | 2015731150083 | BELUM PROPOSAL | ||
59 | SIDIQ DWI SAPUTRA | 2015731150084 | BELUM PROPOSAL | ||
60 | SULARNO | 2015731150087 | BELUM PROPOSAL | ||
61 | TRI ASTUTI PRASANTI | 2015731150089 | BELUM PROPOSAL | ||
62 | VIDIA WIDIASTUTI WIYONO | 2015731150092 | BELUM PROPOSAL | ||
63 | WAHYU BAGUS SETIYAWAN | 2015731150093 | BELUM PROPOSAL | ||
64 | WAHYU BAGUS SETIYONO | 2015731150094 | BELUM PROPOSAL | ||
65 | YANUAR WIDYARSA | 2015731150096 | BELUM PROPOSAL |