DAFTAR PEMBIMBING TUGAS AKHIR


UNTUK ANGKATAN 40, BERIKUT INI ADALAH

DAFTAR PEMBIMBING TUGAS AKHIR

BAGI YANG SUDAH SIAP SEGERA ASISTENSI KE PEMBIMBING MASING-MASING

SEHINGGA  AKAN CEPAT PENYELESAIANNYA.

segera asistensi ke pembimbing masing-masing  untuk langkah selanjutnya

download di sini  daftar-pembimbing-ta-39

1 BERIZKA ARDANIS 2015731150047 PERANCANGAN SISTEM DRAINASE BARU JALAN KALIMANTAN KOTA GRESIK Ir. Darmadi, MM OKE
2 BESTEN JOYMEN 2015731150048 ANALISIS PERBANDINGAN BIAYA PELAKSANAAN PONDASI CORRUGATED CONCRETE SHEET PILE DAN BORE PILE PADA LERENG SUTET KOTA DELTAMAS Ir. Darmadi, MM OKE
3 HANNIF ARIASTO RAHARJO 2015731150064 PERANCANGAN PERBAIKAN SERVICE ROAD AREA TERMINAL KARGO DI BANDARA SOEKARNO-HATTA Ir. Darmadi, MM OKE
4 JHON POLTAK RIZKY SIMAMORA 2015731150069 PERANCANGAN PELEBARAN SALURAN DRAINASE AIRSIDE DI BANDARA HALIM PERDANA KUSUMA Ir. Darmadi, MM OKE
5 MUHAMMAD LUTHFI 2015731150074 PERANCANGAN PONDASI TOWER SST 42 M Ir. Darmadi, MM OKE
6 RAJA UMAR 2015731150077 ANALISIS PERENCANAAN STRUKTUR BENDUNG TETAP GUNUNG NAGO KOTA PADANG Ir. Darmadi, MM OKE
7 SARAH ADISTIA SORAYA 2015731150082 ANALISIS DEBIT BANJIR PADA NORMALISASI KALI KRUKUT RUAS RENGAS HINGGA MESEUM WIDYA CHANDRA Ir. Darmadi, MM (-) Baja
8 BUDIMAN OKTOPRANA 2014731150049 PERANCANGAN DIMENSI SALURAN DRAINASE CLUSTER MISSISSIPPI JAKARTA GARDEN CITY CAKUNG JAKARTA TIMUR – DKI JAKARTA Ir. Darmadi, MM (-) Matrikulasi: Statika, Mek. Bahan, Mek, Fluida
9 ABDI DZIL IKRAM 2015731150041 ESTIMASI DAN CASH FLOW PEKERJAAN STRUKTUR PONDASI PROYEK HOTEL LE PREMIERE KOTA DELTAMAS Ir. Eri Setia Romadhon, MT OKE
10 APIF NUR IMAM 2015731150043 PERHITUNGAN VOLUME PEKERJAAN STRUKTUR PADA BANGUNAN GEDUNG DENGAN MENGGUNAKAN SOFTWARE MODELLING UNTUK MENDAPATKAN NILAI EFISIENSI BIAYA PROYEK Ir. Eri Setia Romadhon, MT OKE
11 BIERDE BIEDENKOPF GIEOVANDO 2015731150049 PENGENDALIAN PROYEK PEMBANGUNAN SEKOLAH AL AZHAR TAHAP II SUMMARECON BEKASI Ir. Eri Setia Romadhon, MT OKE
12 DERIANSYAH ABDULLAH 2015731150053 PERANCANGAN PERKERASAN LENUR TAXIWAY NC3 UNTUK JENIS PESAWAT AIRBUS B747-400 DI BANDARA SOEKARNO – HATTA Ir. Eri Setia Romadhon, MT (-) Jembatan
14 MUHAMAD AULIA ARASY 2015731150072 PERHITUNGAN ANGGARAN BIAYA PROYEK PERUMAHAN SERPONG LAGOON TYPE 84 Ir. Eri Setia Romadhon, MT OKE
15 RHIDWHAN FADHEL ARIP RIZQHIAL 2015731150079 PERHITUNGAN LINTASAN KRITIS PADA PROYEK PEMBANGUNAN APARTEMEN MARIGOLD NAVA PARK – BSD CITY Ir. Eri Setia Romadhon, MT OKE
16 SITI RAHMAWATI 2015731150086 RANCANGAN CAMPURAN BETON MUTU TINGGI DENGAN PENAMBAHAN ADMIXTURE HIGH-SUPERPLASTISIZER & RETARDER PADA PROYEK TAMAN ANGGREK RESIDENCE Ir. Eri Setia Romadhon, MT OKE
17 LEONARD THONI B. MANURUNG 2014731150121 ANALISIS PERCEPATAN PEMBANGUNAN PROYEK JEMBATAN PENYEBERANGAN ORANG (JPO) KOTA DEPOK Ir. Eri Setia Romadhon, MT OKE
45 RIOLAN SAGALA 2015731150080 ANALISIS PENGARUH VARIASI DIMENSI KOLOM TERHADAP KINERJA BATAS LAYAN DAN KINERJA BATAS ULTIMIT PADA PORTAL GEDUNG 5 LANTAI DI DAERAH RAWAN GEMPA YANG MENGACU PADA SNI 03-1726-2002 Ir. Eri Setia Romadhon, MT (-) Mat.Jalan
18 BANI PRATAMA 2015731150045 EVALUASI PEMBANGUNAN PERMUKIMAN DITINJAU DARI ASPEK BIAYA, WAKTU DAN MANAJEMEN STUDI KASUS: PEMBANGUNAN RUMAH TINGGAL ORCHARD PARK BATAM Ir. Fatmawati Oemar, MM OKE
19 DIANTO NUR UTOMO 2015731150055 PERBANDINGAN BIAYA SEWA BEKISTING PERI SYSTEM PADA PROYEK HOTEL GRAND CLASIC CIKARANG DENGAN BEKISTING KONVENSIONAL Ir. Fatmawati Oemar, MM OKE
20 FIRMAN RIZKY ANNANDA 2015731150062 ANALISIS KELONGSORAN PADA TEBING SUNGAI CILIWUNG DI PERUMAHAN PESONA KHAYANGAN DEPOK Ir. Fatmawati Oemar, MM OKE
21 IPNU SUPRIYANTO 2015731150067 PENINGKATAN PELAYANAN RUAS JALAN PADA JALAN RAYA PASAR MINGGU, JAKARTA SELATAN Ir. Fatmawati Oemar, MM OKE
22 JANNE ASTRIA BANJAR NAHOR 2015731150068 PERANCANGAN EAST CROSS TAXIWAY DI BANDARA SOEKARNO-HATTA Ir. Fatmawati Oemar, MM OKE
23 SABIRIN 2015731150081 PERANCANGAN PERPANJANGAN TAXIWAY NP1 PROYEK BANDARA SOEKARNO-HATTA KOTA TANGERANG Ir. Fatmawati Oemar, MM (-) Jembatan
24 SIGIT WURYANTO 2015731150085 PERHITUNGAN RENCANA ANGGARAN PELASANAAN PEMBANGUNAN GEDUNG LABORATORIUM KEMENTRIAN PERHUBUNGAN Ir. Fatmawati Oemar, MM (-) Matrik, Jembatan, Prategang
25 ANISA TAQIATUN BARI’AH 2015731150042 PERHITUNGAN WAKTU DAN ANGGARAN BIAYA PELASANAAN PROYEK BIOGAS TEPUNG TAPIOKA Ir. Indartono Rivai, MM OKE
26 CHRISTINA ADATTA SITORUS 2015731150052 PENANGANAN KAWASAN KUMUH MENGACU PADA PERATURAN MENTERI PEKERJAAN UMUM NO.1 TAHUN 2014 (LOKASI?) Ir. Indartono Rivai, MM (-) Mek. Fluida, Statika
27 DICKY WIJAYA 2015731150056 PERANCANGAN FLEXIBLE PAVEMENT TAXIWAY NCW UNTUK JENIS PESAWAT AIRBUS A380-800 DI BANDARA SOEKARNO-HATTA Ir. Indartono Rivai, MM OKE
28 FERDIA SUSANTI 2015731150060 PENGENDALIAN WAKTU DAN BIAYA BEKISTING SYSTEM PERI UP PADA PROYEK RS ADMAJAYA JAKARTA Ir. Indartono Rivai, MM OKE
29 NUR ULFAH BAHRI HALIM 2015731150076 EFEKTIVITAS PENGGUNAAN TOWER CRANE PADA PROYEK PROJECT DISTRICT 8 LOT 28 Ir. Indartono Rivai, MM OKE
30 TITO SUCIPTO 2015731150088 ANALISIS BIAYA DAN WAKTU BEKISTING VERTIKAL SISTEM ENKOFORM V-100 PROYEK GRAND MANSION APARTMENT JAKARTA Ir. Indartono Rivai, MM OKE
31 TRIANDY BAYU PRIHASTONO 2015731150090 ANALISIS PERBANDINGAN WAKTU DAN BIAYA BEKISTING PELAT BALOK PADA GREEN PRAMUKA CITY TOWER MAGNOLIA Ir. Indartono Rivai, MM OKE
32 YANE KINANTI DE YOLA NULE 2015731150095 PERANCANGAN PERLUASAN APRON AREA KARGO DI BANDARA SOEKARNO-HATTA Ir. Indartono Rivai, MM OKE
33 HENDRI SUJADMIKO 2014731150059 PRODUKTIVITAS ALAT BERAT DALAM PEKERJAAN GALIAN PADA PROYEK PEMBANGUNAN GEDUNG PELAYANAN KESEHATAN RS St.CAROLUS, JAKARTA PUSAT Ir. Indartono Rivai, MM (-) Matrikulasi: Statika, Mek. Bahan, Mek, Fluida
34 RISWAN OKI FERNANDO SIDABUTAR 2014731150141 PERHITUNGAN RENCANA ANGGARAN PELAKSANAAN (RAP) PROYEK PEMBANGUNAN APARTEMEN THE GREEN PRAMUKA RESIDENCE TOWER ORCHID Ir. Indartono Rivai, MM OKE
35 FAJAR YUSUF ARDANI 2015731150058 ANALISIS KEBUTUHAN PARKING STAND APRON PIER 2 TEMINAL 3 ULTIMATE BANDARA SOEKARNO-HATTA Ir. Sri Yuniarti, MT OKE
36 HERIS CAHYA KUSUMA 2015731150065 OPTIMASI PENANGANAN DAMPAK RENCANA PEMBANGUNAN SPBU SHELL DI KOTA TANGERANG SELATAN Ir. Sri Yuniarti, MT (-) Mek. Bahan
37 LUTHFIANA SARI DEWI 2015731150071 ANALISIS ANALISIS DAMPAK LALU LINTAS PEMBANGUNAN APARTEMEN GREEN HILLS (LOKASI?) Ir. Sri Yuniarti, MT (-) Mek. Bahan
38 RATNA DEWI SARTIKA 2015731150078 ANALISIS PENINGKATAN KESELAMATAN PADA PERLINTASAN SEBIDANG JPL NO.81 BEKASI Ir. Sri Yuniarti, MT OKE
39 YUDA MANDALA PUTRA C 2015731150097 PERANCANGAN PEMBUATAN APRON B73 TERMINAL 1 BANDAR UDARA INTERNASIONAL SOEKARNO-HATTA Ir. Sri Yuniarti, MT (-) 6 MK (Harus Kuliah)
40 AYU FITRI WIJAYANTI 2014731150093 ANALISIS ANGKUTAN BARANG DI KECAMATAN CICURUG KABUPATEN SUKABUMI Ir. Sri Yuniarti, MT (-) Statika
41 SANDY RIMAWAN 2014731150072 ANALISIS DAN REKAYASA PERSIMPANGAN SGC CIKARANG DI KABUPATEN BEKASI Ir. Sri Yuniarti, MT OKE
13 GABE PARDAMEAN SIDABUTAR 2015731150063 EVALUASI PROYEK PEMBANGUNAN KANTOR KELURAHAN PONDOK BETUNG DENGAN MENGGUNAKAN MS.PROJECT Ir. Sudarwati, MM (-) Mek. Bahan
42 BUDI DERMAWAN 2015731150050 ANALISIS BIAYA DAN WAKTU METODE PELAKSANAAN PEKERJAAN SALURAN BETON PRECAST ON SITE DAN SALURAN BETON KONVENSIONAL PADA PROYEK POS LINTAS NEGARA ENTIKONG Ir. Sudarwati, MM OKE
43 CAECILIA PATRICIA YOLANDA 2015731150051 PERANCANGAN PERLUASAN APRON NSA DI TERMINAL 1 BANDARA SOEKARNO-HATTA Ir. Sudarwati, MM OKE
44 MUHAMMAD MUGHNY HALIM 2015731150073 PERANCANGAN KADAR ASPAL OPTIMUM PADA LAPIS AUS (AC-WC) PROYEK PEMELIHARAAN JALAN TOL CAWANG-TOMANG-CENGKARENG Ir. Sudarwati, MM OKE
46 UMAMUL HUSEN 2015731150091 ANALISIS PERKERASAN LAPANGAN PARKIR KENDARAAN DI LOKSI M-1 BANDARA SOEKARNO-HATTA Ir. Sudarwati, MM OKE
47 RIZALDY FEBRIYANTO 2012731150175 ANALISIS BIAYA PELAT LANTAI SISTEM HOLLOW CORE SLAB (HCS) DENGAN PELAT LANTAI KONVENSIONAL PADA BANGUNAN SECONDARY BUILDING PT. HM SAMPOERNA PROJECT KARAWANG Ir. Sudarwati, MM (-) Man.Kon, Etika Profesi
48 RUDDY HADI PRIANSAH 2012731150141 PERBAIKAN TANAH DASAR DENGAN METODE CTRB PADA JALAN MALINGPING – BAYAH KAB. LEBAK Ir. Sudarwati, MM OKE
49 BAMBANG PURWANTO AGUS SAPUTRO 2015731150044 BELUM PROPOSAL
50 BENN HUDSON 2015731150046 BELUM PROPOSAL
51 DEVI APRILIA SARI 2015731150054 BELUM PROPOSAL
52 ERWIN PARLINDUNGAN 2015731150057 BELUM PROPOSAL
53 FARIS WIDYANTO 2015731150059 BELUM PROPOSAL
54 FERNANDO TUA BUTAR BUTAR 2015731150061 BELUM PROPOSAL
55 ICHSAN ADITYA 2015731150066 BELUM PROPOSAL
56 KURNIAWAN BIMA PRAKOSO 2015731150070 BELUM PROPOSAL
57 NATAL GUNANTA PURBA 2015731150075 BELUM PROPOSAL
58 SHINTA RATNA AFIANINGRUM 2015731150083 BELUM PROPOSAL
59 SIDIQ DWI SAPUTRA 2015731150084 BELUM PROPOSAL
60 SULARNO 2015731150087 BELUM PROPOSAL
61 TRI ASTUTI PRASANTI 2015731150089 BELUM PROPOSAL
62 VIDIA WIDIASTUTI WIYONO 2015731150092 BELUM PROPOSAL
63 WAHYU BAGUS SETIYAWAN 2015731150093 BELUM PROPOSAL
64 WAHYU BAGUS SETIYONO 2015731150094 BELUM PROPOSAL
65 YANUAR WIDYARSA 2015731150096 BELUM PROPOSAL

 

Leave a comment